Unit hydrograph, assumptions and limitations
Short answer
A unit hydrograph is the direct runoff hydrograph from 1 cm of effective rainfall uniformly over a basin in a specified duration. Assumptions: uniform intensity and distribution, constant base time, linearity, superposition. Limitations: basin size 25–5000 km², non-uniform rain, not for snowmelt or regulated basins, needs S-curve for different durations.
What is Unit hydrograph? What are assumptions and limitations of UH?
Unit hydrograph (UH)
A unit hydrograph (Sherman, 1932) is the direct runoff hydrograph resulting from 1 unit (1 cm or 1 mm) of effective rainfall falling uniformly over the whole basin at a uniform rate during a specified duration . It is written as the -hour unit hydrograph.
Q | /\
| / \
| / \___
|___/ \____
+------------------- t
|<-- Tb (base) --->|
Assumptions
- Constant intensity: effective rainfall is uniform in intensity over the duration .
- Uniform distribution: effective rainfall is uniformly spread over the whole drainage area.
- Constant base time: the base time of the direct runoff hydrograph is the same for all storms of equal duration, whatever the intensity.
- Linearity (proportionality): ordinates of DRH due to the same duration are directly proportional to the effective rainfall depth; for twice the rain, ordinates are doubled.
- Superposition (time invariance): the hydrographs of successive rain periods can be added; the catchment response does not change with time.
- All characteristics of the catchment are reflected in the shape of the UH.
Limitations
- Applies to catchments of about 25 to 5000 km; very small (< 25 km) or very large basins (> 5000 km) violate the assumptions.
- Not valid when rainfall is not uniform in space or time, or storms move across the basin.
- Not suitable for snowmelt-dominated or heavily regulated basins, or basins with large storage (lakes, reservoirs).
- Cannot handle effective rainfall of different durations without S-curve conversion.
- Real catchment behaviour is not exactly linear; UH from small storms may differ from that of large floods.
- Needs reliable rainfall and streamflow records; an ungauged basin needs synthetic methods.
- Derived UH is valid only for that point on the stream.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Unit hydrograph, assumptions, base flow separation · Engineering Hydrology, chapter 5
- Unit hydrograph and UH for multiple storms · Engineering Hydrology, chapter 5 · asked 2×
- 2-hr UH and flood hydrograph from storm · Engineering Hydrology, chapter 5
- 2-h UH by S-curve from storm hydrograph · Engineering Hydrology, chapter 5
- S-hydrograph from rectangular 1-hr UH · Engineering Hydrology, chapter 5
- Flood hydrograph from 6-h UH, three storms · Engineering Hydrology, chapter 5