Short answer

Using the simplified moment method, theoretical embedment D = 3.98 m. With a 20% increase for safety, adopt D ≈ 4.8 m (total length ~9.8 m).

An excavation of 5 m deep is to be carried out in sandy soil deposit having unit weight =22 kN/m3= 22\ \text{kN/m}^3 and angle of shearing resistance =33∘= 33^\circ. To support the soil, cantilever sheet pile walls are driven into the ground prior to excavation. Determine the depth of embedment needed for the sheet pile to retain the backfill. The water table is located below the base of the sheet pile.

Data: H=5H = 5 m, γ=22\gamma = 22 kN/m3^3, ϕ=33∘\phi = 33^\circ, no water above the pile tip. Cantilever sheet pile, simplified moment method (moments about the toe).

Ka=tan⁡2(45∘−16.5∘)=0.2948,Kp=tan⁡2(45∘+16.5∘)=3.3921K_a = \tan^2(45^\circ - 16.5^\circ) = 0.2948,\qquad K_p = \tan^2(45^\circ + 16.5^\circ) = 3.3921

Forces (with DD = embedment below the dredge line, γ\gamma same on both sides):

  • Active force on the back: Pa=12Kaγ(H+D)2P_a = \tfrac12K_a\gamma(H+D)^2, acting at (H+D)/3(H+D)/3 above the tip.
  • Passive force in front: Pp=12KpγD2P_p = \tfrac12K_p\gamma D^2, acting at D/3D/3 above the tip.

Moment about the tip

12Kaγ(H+D)2H+D3=12KpγD2D3 ⇒ DH+D=(KaKp)1/3=(0.29483.3921)1/3=0.4429\tfrac12K_a\gamma(H+D)^2\frac{H+D}{3} = \tfrac12K_p\gamma D^2\frac{D}{3} \ \Rightarrow\ \frac{D}{H+D} = \left(\frac{K_a}{K_p}\right)^{1/3} = \left(\frac{0.2948}{3.3921}\right)^{1/3} = 0.4429 D=0.4429×51−0.4429=3.98 mD = \frac{0.4429\times5}{1-0.4429} = 3.98\ \text{m}

Design depth: since the method assumes full passive resistance and ignores the extra tip reaction, increase by 20%:

Ddesign=1.2×3.98=4.77 mD_{design} = 1.2\times3.98 = 4.77\ \text{m}

Answer: theoretical embedment D=3.98D = 3.98 m; adopt D≈4.8D \approx 4.8 m (total pile length about 9.8 m).