Short answer

For a 5 m high retained sand (φ=30°), cantilever analysis yields embedment depth 4.63 m. Adding an anchor at 1 m depth using free earth support reduces required embedment to 1.90 m, a 59% decrease, because the anchor supplies horizontal reaction that the cantilever would otherwise obtain from deeper passive resistance.

Assume suitable condition to prove that use of anchor can reduce the depth of embedment of cantilever sheet pile wall.

Assumed condition: sheet pile wall retaining H=5H = 5 m of dry sand (ϕ=30∘\phi = 30^\circ, same on both sides), γ\gamma the same on both sides, passive resistance with FS=1FS = 1 for the comparison, anchor at 1 m below the top (free earth support).

Ka=tan⁡2(45∘−15∘)=0.3333,Kp=tan⁡2(45∘+15∘)=3.0K_a = \tan^2 (45^\circ-15^\circ) = 0.3333,\qquad K_p = \tan^2(45^\circ+15^\circ) = 3.0

(a) Cantilever wall: the moment about the toe must balance:

12Kaγ(H+D)2(H+D)3=12KpγD2D3 ⇒ DH+D=(KaKp)1/3=0.4807\tfrac12K_a\gamma(H+D)^2\frac{(H+D)}{3} = \tfrac12K_p\gamma D^2\frac{D}{3}\ \Rightarrow\ \frac{D}{H+D} = \left(\frac{K_a}{K_p}\right)^{1/3} = 0.4807 Dcant=5×0.48071−0.4807=4.63 mD_{cant} = \frac{5\times0.4807}{1-0.4807} = 4.63\ \text{m}

(b) Anchored wall (free earth support): take moments about the anchor point (the anchor force TT drops out):

12Kaγ(H+D)2[23(H+D)−1]=12KpγD2[H+23D−1]\tfrac12K_a\gamma(H+D)^2\left[\tfrac23(H+D) - 1\right] = \tfrac12K_p\gamma D^2\left[H + \tfrac23D - 1\right]

Solving, Danch=1.90D_{anch} = 1.90 m, and the anchor force from ∑H=0\sum H = 0 is

T=12Kaγ(H+D)2−12KpγD2 (per unit γ)=7.94γ−5.43γ=2.51γT = \tfrac12K_a\gamma(H+D)^2 - \tfrac12K_p\gamma D^2 \ (\text{per unit }\gamma) = 7.94\gamma - 5.43\gamma = 2.51\gamma

(with γ=18\gamma = 18 kN/m3^3, T≈45T \approx 45 kN/m).

Comparison: Danchored=1.90D_{anchored} = 1.90 m ≪Dcantilever=4.63\ll D_{cantilever} = 4.63 m, about 59% less. The anchor supplies the horizontal reaction that the cantilever wall must get from the passive resistance of a deep embedment, so the embedment, and also the pile length and bending moment, are reduced.