- Asked 2/20
- 2074 Chaitra
- 2069 Chaitra · 9 marks
Case study: processing plants and improvement
Short answer
Studied plants: reception/chilling, HTST pasteurisation, homogenisation/storage, filling and utilities. Improvement: automate with distributed microcontroller/PLC nodes linked via RS-485 to a central SCADA PC, each node controlling sensors and actuators. This provides consistent quality, reduced losses, lower manpower, traceability and predictive maintenance.
Describe the different processing plants that you have studied in case study. With neat and clean block diagram explain how the further improvement of these plants can be made.
Assumed case study: a milk pasteurisation and packaging section of a dairy plant (HTST process: raw milk tank, heat exchanger, steam-heated holding tube, cooling, filling). The existing system uses analog panel indicators, bimetal thermostats, a manual steam valve and operator logging. (If your own visit was to another plant, replace the process names; the structure of the answer stays the same.)
Processing plants studied (in the milk plant)
- Reception and chilling section: milk is received in cans/tankers, weighed, tested (fat, SNF, acidity), filtered and chilled to below 5 C in a chiller.
- Pasteurisation plant: HTST heat exchanger heats milk to 72 C for 15 s, then cools it to about 4 C. Steam from a boiler is used.
- Homogenisation and storage: homogeniser and insulated storage tanks.
- Packaging (filling) plant: pouch filling machine, date coding and crates.
- Utilities: boiler, ice-bank/refrigeration, compressed air, effluent treatment.
Further improvement with block diagram
Automate the plant using distributed microcontroller/PLC nodes connected to a central supervisory computer:
Reception node --+
Pasteuriser node-+--RS-485/Modbus--> Master PC (SCADA)
Storage node ----+ trend, alarm, report
Filling node ----+
each node: sensor -> ADC -> MCU -> relay/valve
- Pasteuriser: PT100, PID steam control, flow-diversion valve, data logger.
- Chilling and storage: temperature and level sensors with alarms and automatic agitator/pump control.
- Filling: weight/volume dosing with count and batch totals.
- Central SCADA: set-points, alarms, daily reports and energy monitoring; later link to ERP.
- Benefits: constant quality, lower losses, less manpower, traceability and predictive maintenance.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Case study: current control and recommendation · Instrumentation II, chapter 10 · asked 3×
- Case study: critical factors in process control · Instrumentation II, chapter 10 · asked 2×
- Case study: revamping MBI system for CEO · Instrumentation II, chapter 10
- Case study: recommended changes and convincing · Instrumentation II, chapter 10 · asked 2×
- Case study: new system vs existing (cost, manpower) · Instrumentation II, chapter 10 · asked 4×
- Case study: workflow, factors, proposed design, benefits · Instrumentation II, chapter 10
- Biogas plants under Clean Development Mechanism · Power Plant Design, chapter 1 · asked 2×
- Case study: Nepal Electricity Authority / Telecom · Organization and Management, chapter 9
- Experience of case study performed · Energy Environment and Society, chapter 6 · asked 2×