- Asked 3/20
- 2073 Chaitra · 12 marks
- 2070 Asar
- 2076 Asoj · 12 marks
Case study: current control and recommendation
Short answer
The existing manual system lacks feedback; operator adjusts steam valve and logs data, causing poor control. Recommendation: microcontroller-based closed-loop with PT100, PID steam control and SCADA logging for precise pasteurisation, HACCP traceability and labour/steam savings with fast payback. Challenges: operator training, sensor calibration, EMI and need for manual bypass on controller failure.
Discuss the current control mechanism of the industrial process control system involved in your case study with the help of block diagram. What was your recommendation for further improvement of this system? Explain why the management should implement your recommendation. Do you foresee any problems after implementing this control system?
Assumed case study: a milk pasteurisation and packaging section of a dairy plant (HTST process: raw milk tank, heat exchanger, steam-heated holding tube, cooling, filling). The existing system uses analog panel indicators, bimetal thermostats, a manual steam valve and operator logging. (If your own visit was to another plant, replace the process names; the structure of the answer stays the same.)
Current control mechanism
Raw milk tank --> pump --> heat exch. --> holding tube
(level sw) (motor (steam valve (72 C, 15 s)
starter) manual) |
cooling --> filling
Panel meters / thermostats <-- operator reads, adjusts
The operator reads the thermometer and the panel meter and opens or closes the steam valve by hand to hold 72-75 C. A bimetal thermostat gives a crude over-temperature trip, and the pump runs by push-button. Level is observed visually and data is written in a logbook. There is no feedback loop, no alarms and no records.
Recommendation
Replace manual control with a microcontroller-based closed-loop system:
PT100 --> Amp/SigCond --+
Level sensor ----------+--> MUX/ADC (12-bit)
Flow sensor ---(pulse)-+ |
Keypad ----------------+---> [Microcontroller] <--> LCD 16x2
| ARM/AVR + flash |
Opto + SSR/relay <----------+ watchdog, timers +--> RS-485
| | (Modbus)
Pump / steam valve / alarm +--> EEPROM log PC / SCADA
Power supply: 24 V + 5 V + UPS
- A PT100 sensor with a signal-conditioning amplifier and a 12-bit ADC for temperature.
- A controller using ON/OFF control with hysteresis (or PID) to drive the steam valve through an optocoupler and relay/SSR, plus a flow-diversion valve that sends milk back if the temperature is below 72 C.
- An LCD and keypad for set-point and alarms, and an RS-485 link to a PC for logging.
Key figures (calculated): a PT100 amplifier scaled 0-150 C to 0-5 V and a 12-bit ADC give a resolution of 150/4096 = 0.037 C per count (1.22 mV per count at 5 V), enough for the ±0.5 C pasteurisation limit. An 8-byte Modbus-style frame at 9600 baud takes 8 × 10 bits / 9600 = 8.3 ms, so every point can be updated several times per second.
Why management should accept it
- Better product quality and food safety (consistent pasteurisation, traceable records for standards such as HACCP).
- Savings in steam, labour and rejected milk, so the payback is short.
- Less dependence on operators and fewer breakdowns, with the possibility of expansion.
Cost-benefit (assumed figures): investment Rs 12,00,000 (controller panel, sensors, valves, SCADA PC, installation, training). Monthly savings: manpower Rs 60,000, steam/energy Rs 35,000, reduced rejection Rs 20,000 = Rs 1,15,000. Payback = 12,00,000 / 1,15,000 ≈ 10.4 months; yearly return = 13.8 lakh on 12 lakh, about 115 percent.
Problems expected after implementation
Operator training and acceptance, calibration and maintenance of sensors, electrical noise and power quality, software faults, spare-part availability, and the need for a manual bypass when the controller fails.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Case study: new system vs existing (cost, manpower) · Instrumentation II, chapter 10 · asked 4×
- Case study: critical factors in process control · Instrumentation II, chapter 10 · asked 2×
- Case study: problems after implementation · Instrumentation II, chapter 10
- Case study: processing plants and improvement · Instrumentation II, chapter 10 · asked 2×
- Case study: revamping MBI system for CEO · Instrumentation II, chapter 10
- Case study: recommended changes and convincing · Instrumentation II, chapter 10 · asked 2×
- Digital control system block diagram and advantages · Digital Control System, chapter 1 · asked 3×
- Event management system summary and class diagram · Object Oriented Analysis and Design, chapter 2
- Closed loop control system block diagram explained · Control Systems, chapter 1 · asked 4×
- General block diagram of a control system · Control Systems, chapter 1