- 2068 Chaitra · 5 marks
Regression of maintenance cost on car age
Short answer
Regression equation: ŷ = −1.70 + 4.45X (cost in Rs.000). For a 10-year-old car, estimated maintenance cost = 42.80 (Rs.000).
The following table gives the age of the cars of a certain company and annual maintenance costs: Age of cars (Years): 2 4 6 8 10 Maintenance costs (Rs.000): 10 15 22 32 46 Obtain the regression equation for cost related to age and also estimate the cost of maintenance for 10 yrs old car.
Let X = age of car (years) and Y = annual maintenance cost (Rs. 000). Regression of cost on age: Ŷ = a + bX.
Sums (n = 5):
x y xy x² y²
2 10 20 4 100
4 15 60 16 225
6 22 132 36 484
8 32 256 64 1024
10 46 460 100 2116
---------------------------------------------
30 125 928 220 3949
Σx = 30, Σy = 125, Σxy = 928, Σx² = 220, Σy² = 3949
Means: x̄ = 6.0000, ȳ = 25.0000
Sxx = Σx² − (Σx)²/n = 40.0000 Sxy = Σxy − (Σx)(Σy)/n = 178.0000 Syy = Σy² − (Σy)²/n = 824.0000
Slope b = Sxy/Sxx = 178.0000/40.0000 = 4.4500 Intercept a = ȳ − bx̄ = 25.0000 − (4.4500)(6.0000) = -1.7000
Regression equation: Ŷ = -1.70 + 4.45 X (r = 0.980)
Cost for a 10-year-old car
Ŷ = -1.7000 + 4.4500 × 10 = 42.80 (Rs. 000)
Answer: Ŷ = -1.70 + 4.45X; maintenance cost for a 10-year-old car ≈ Rs. 42800 (the fitted value; the actual observed cost is Rs. 46,000).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Twists regression; CI for slope · Probability and Statistics, chapter 5 · asked 3×
- Twists regression; predict at 20% · Probability and Statistics, chapter 5 · asked 3×
- Regression: operator experience and performance · Probability and Statistics, chapter 5
- Multiple regression: yield on rainfall, fertilizer · Probability and Statistics, chapter 5
- 22 pairs: means, consistency, correlation · Probability and Statistics, chapter 5
- Regression of wear on oil viscosity · Probability and Statistics, chapter 5 · asked 2×
- Annual charge and pf improvement (Rs 65/kVA tariff) · Utilization of Electrical Energy, chapter 6 · asked 3×
- EPS; total capital Rs 15,00,000 · Project Engineering, chapter 6
- EVA; 10 days, 100,000, day 6, Rs 65,000 · Project Engineering, chapter 4
- Valuation of a cinema hall (land Rs 15 lakh) · Construction Management, chapter 13 · asked 2×