- 2076 Shrawan · 3 marks
Deposit now to draw growing monthly amount
Short answer
With nominal 12% compounded monthly, i=1%. Use geometric gradient present worth: P = 5,000 × [1 - (1.02/1.01)^120] / (0.01 - 0.02) = Rs 11,30,894.
How many rupees should you deposit now so that you will be able to draw Rs 5000 at the end of this month which increases by 2 percent per month for 10 years. Bank interest rate is 12% per year.
Data and assumption
First withdrawal A₁ = Rs 5,000 at the end of month 1, growing by g = 2% per month for n = 120 months. The interest of 12% per year is taken as nominal, compounded monthly: i = 1% per month.
Formula (geometric gradient present worth)
For i ≠ g: P = A₁ [1 − ((1 + g)/(1 + i))ⁿ] / (i − g)
A1=5000 5100 5202 ... (x1.02 each month)
^ ^ ^ ^
--+-------+-----+--- ... ---+--> month
0 1 2 3 120
P = ?
Calculation
(1 + g)/(1 + i) = 1.02/1.01 = 1.009901 ((1.02)/(1.01))¹²⁰ = 3.26179 i − g = 0.01 − 0.02 = −0.01
P = 5,000 × (1 − 3.26179) / (−0.01) = 5,000 × 226.179 = Rs 1,130,894
Answer: Deposit now about Rs 11.31 lakh. (If 12% were an effective annual rate, i would be 0.9489% per month and the answer would be a little larger.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Define equivalent worth and ROR; deposit to draw monthly · Engineering Economics, chapter 2
- Monthly deposits with quarterly compounding, future amount · Engineering Economics, chapter 2
- Capitalized worth and infinite-period deposit · Engineering Economics, chapter 2
- Mutual fund from growing salary, 15 years · Engineering Economics, chapter 2
- Compounding semi-annually and monthly, 10% nominal · Engineering Economics, chapter 2
- Car loan interest rate and lump sum at year 3 · Engineering Economics, chapter 2
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Capitalised value from Rs 20,000 monthly rent · Construction Management, chapter 13
- Symbol rate, entropy and information rate (6 symbols per 10 μs) · Communication Systems, chapter 6
- Rate analysis: M20 (1:1½:3) RCC per 10 m³ · Estimating and Costing, chapter 4