- 2071 Magh · 6 marks
Slope area method of discharge
Short answer
The slope-area method computes flood discharge from high-water marks and surveyed cross-sections. Using Manning’s equation, energy equation, and conveyance, discharge is found by trial as Q = K√(hf/L), where friction slope hf/L is corrected for velocity head changes.
How the discharge of a stream or river can be computed by slope area method?
The slope-area method is an indirect method of finding discharge, mainly used for flood peaks when direct current-meter measurement is not possible. Discharge is computed from the water surface slope (from high flood marks) and the channel cross-sections, using Manning's equation.
Field work
- Select a fairly straight, uniform reach (length , about 75 m or more, fall ≥ 0.15 m).
- After the flood, survey high water marks (silt lines, debris) at two (or more) sections 1 and 2.
- Survey the cross-sections to get area , wetted perimeter and hydraulic radius at each section.
- Estimate Manning's from bed and bank conditions.
Sec 1 Sec 2
___ HFL ___ Dz (fall)
| ------____
| y1 L ----___ HFL
|____________________________y2_|
=========== bed ============>
Computation
Energy equation between sections 1 and 2:
where = water surface elevation, = eddy loss (–0.1 for contracting, 0.3 for expanding reach).
Conveyance at each section; average .
Since depends on , solve by trial:
- First take (fall), find and .
- Compute , ; correct with the velocity head and eddy loss terms.
- Repeat until stops changing (usually 2–3 trials).
Limitations: accuracy depends on the choice of and on reliable flood marks; the reach must be free of backwater and sudden changes.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Stream discharge from current meter revolutions (V = 0.51N + 0.03) · Hydro Power, chapter 2 · asked 2×
- Stream discharge from current meter revolutions (v = 0.55N + 0.04) · Hydro Power, chapter 2 · asked 2×
- River discharge by mid-section method · Hydro Power, chapter 2
- Discharge from 0.2d and 0.8d velocities (right bank) · Hydro Power, chapter 2
- Discharge from depth and mean velocity data · Hydro Power, chapter 2
- Stream gauging with calibration equation · Hydro Power, chapter 2
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4
- Stream flow by slope-area method · Engineering Hydrology, chapter 4 · asked 3×
- Slope-area discharge, 1300 m reach · Engineering Hydrology, chapter 4 · asked 2×
- Slope-area flood discharge, 7 km reach · Engineering Hydrology, chapter 4 · asked 2×