Peak flood discharge is obtained by applying Manning’s equation to high-water marks at two cross-sections. Friction slope is computed from water-surface fall and velocity-head difference, iterated until discharge converges.
Explain the stream flow computation by slope area method.
The slope-area method is an indirect method used to estimate the peak flood discharge in a reach of a natural channel when a current meter cannot be used (high flood, no gauge). It uses the high-water marks left by the flood and the channel geometry, and applies Manning's equation.
Principle
For steady non-uniform flow, the discharge is
where is the conveyance, is Manning's roughness, the flow area, the hydraulic radius and the friction slope. The friction slope is not equal to the water surface slope when the channel is non-uniform, so it is found from the energy equation between sections 1 (upstream) and 2 (downstream).
energy line ------\
\___ h_f
water surface ---\ \____
\_ fall h
bed ------------------------
[1]<----- L ----->[2]
where is the fall of water surface, the velocity-head coefficient and the eddy loss coefficient (0.3 for a gradual expansion, 0.1 for a gradual contraction).
Procedure
- Select a straight, uniform reach, free of large boulders and bends, with well-defined high-water marks on both banks. Take two or more cross-sections normal to the flow.
- Survey the cross-sections and the high-water mark levels, and measure the reach length .
- Compute , , for each section and estimate from the bed material and vegetation.
- Compute and the mean conveyance .
- Assume and find a first estimate .
- Find , , the velocity heads and . Compute , then a new .
- Repeat until no longer changes.
Merits and limits
- It needs no flow measurement during the flood, and is cheap and quick.
- Accuracy depends mostly on and the quality of the high-water marks; the error can be 10 to 25 %.
- It applies only to steady flow in a stable reach. It is used to extend the rating curve to peak stage.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Slope-area discharge, 1300 m reach · Engineering Hydrology, chapter 4 · asked 2×
- Slope-area flood discharge, 7 km reach · Engineering Hydrology, chapter 4 · asked 2×
- Slope-area discharge with three sections · Engineering Hydrology, chapter 4
- Principle and procedure of slope-area method · Engineering Hydrology, chapter 4
- Slope-area discharge, 10 km reach · Engineering Hydrology, chapter 4
- Stream flow from current meter data · Engineering Hydrology, chapter 4 · asked 2×
- Slope area method of discharge · Hydro Power, chapter 2
- Stream flow from 0.2d and 0.8d measurements · Hydro Power, chapter 2
- Methods of stream flow measurement · Energy Resources, chapter 5
- Moment area: slope and deflection under 50 kN · Theory of Structures I, chapter 4