- 2075 Baisakh · 4 marks
Load factor and demand factor numerical
Short answer
Connected load = 1360 W (12×80W lamps + 4×100W heaters). Daily energy = 5440 Wh (8 lamps×6h + 4 heaters×4h). Average load = 226.67 W. Demand factor = 1500/1360 = 1.103; load factor = 226.67/1500 = 0.151 (15.1%). Note: demand factor >1 indicates probable heater rating error (should be 1000W).
A consumer has the following connected loads: 12 lamps of 80 W each and 4 heaters of 100 W each. His maximum demand is 1500 W. On the average consumer uses 8 lamps 6 hours a day and each heater for 4 hours a day. Find load factor and demand factor.
Formulas used
Demand factor = Maximum demand / Connected load
Load factor = Average load / Maximum demand
Average load = Energy per day / 24 h
Connected load
Lamps : 12 × 80 W = 960 W
Heaters : 4 × 100 W = 400 W
Connected load = 1360 W
Daily energy and average load
Lamps : 8 × 80 W × 6 h = 3840 Wh
Heaters : 4 × 100 W × 4 h = 1600 Wh
Energy per day = 5440 Wh
Average load = 5440 / 24 = 226.67 W
Factors
Demand factor = 1500 / 1360 = 1.103
Load factor = 226.67 / 1500 = 0.1511
Answer (data as printed): load factor = 0.151 (15.1%), demand factor = 1.10.
Note on the data: a demand factor greater than 1 is not possible, because the maximum demand cannot exceed the connected load. The heater rating is almost certainly 1000 W (the standard textbook version of this problem). With 4 heaters of 1000 W:
Connected load = 960 + 4000 = 4960 W
Energy/day = 3840 + 4×1000×4 = 19840 Wh
Average load = 19840 / 24 = 826.67 W
Demand factor = 1500 / 4960 = 0.3024
Load factor = 826.67 / 1500 = 0.5511
Answer (heaters 1000 W): demand factor = 0.302, load factor = 0.551 (55.1%).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Connected load, MD, demand, diversity, load factor · Industrial Power Distribution and Illumination, chapter 1
- Connected load, MD, demand factor, load factor · Industrial Power Distribution and Illumination, chapter 1
- Load centre, connected load, maximum demand · Industrial Power Distribution and Illumination, chapter 1
- Demand factor and diversity factor of substation · Industrial Power Distribution and Illumination, chapter 1
- Load factor of two consumers · Industrial Power Distribution and Illumination, chapter 1
- Maximum demand and need to calculate it · Industrial Power Distribution and Illumination, chapter 1
- Compound generator with 80 lamps · Electrical Machine, chapter 3
- 5th year peak load from consumer survey · Transmission and Distribution System Design, chapter 6 · asked 7×
- Impounded reservoir, 400 m3/day demand · Water Supply Engineering, chapter 2
- Average demand, village survey 2013, design 25 years · Water Supply Engineering, chapter 3 · asked 2×
All Industrial Power Distribution and Illumination chapter 1 questions →