- 2079 Chaitra · 4 marks
Adjustable orifice semi-module design
Short answer
For q=0.22 m³/s and head 0.7 m, adopt orifice width 0.50 m, height Y=0.17 m. Sill level = 100.53 m, roof block at 100.70 m (FSL 101.40, bed 100.00).
Design an adjustable orifice semi-module for the following data: Discharge of the outlet = 0.22 m³/s; Working head = 0.7 m; F.S.L. of distributary = 101.40; Bed level of distributary = 100.00.
The Crump adjustable orifice semi-module (AOSM) has a rectangular orifice whose height can be changed by raising or lowering a roof block, while a flume d/s makes the outlet semi-modular.
Data
m³/s, working head m, FSL of distributary m, bed m (depth m). Discharge coefficient of the orifice (assumed, as is usual for the AOSM).
1. Size of the orifice
Adopt orifice width m. Then
Adopt m. Check: m³/s.
2. Levels
- Underside of the roof block m.
- Sill of the orifice m, which is 0.53 m above the distributary bed (this lets the outlet draw bed silt in proportion).
- The roof block is adjustable by some centimetres, which changes and the discharge.
3. Other dimensions
- Bell-mouthed entry and a parallel throat about long (0.26 m).
- Downstream expanding flume (1 in 5 to 1 in 6 flare) discharging into the water course; a hydraulic jump forms in the flume, so the discharge is independent of the water course level.
- The jet should not be submerged: the minimum modular head is to m below the roof block, so the outlet is modular for water course levels below the sill.
Answer: orifice m, sill at 100.53 m, roof block at 100.70 m.
FSL 101.40 ~~~~~~~~~~~~~~~|
roof block 100.70 ______|_______
<- Y -> \____flume___ water course
sill 100.53 ____________________\_________
bed 100.00 _________________________________
Related questions
- Non-modular, semi-modular outlet; module requirements · Irrigation and Drainage Engineering, chapter 7
- Semi-modular pipe outlet design, flexibility 0.9 · Irrigation and Drainage Engineering, chapter 7
- Design procedure: cross and distributary head regulator · Irrigation and Drainage Engineering, chapter 7
- Pipe outlet minimum water level, 50 lps · Irrigation and Drainage Engineering, chapter 7
- Sarda fall: Q 12, bed level 103 m · Irrigation and Drainage Engineering, chapter 7
- Outlet, requirements, modular vs semi-modular · Irrigation and Drainage Engineering, chapter 7
- Design: 310 m head plant, HV breaker · Power Plant Design, chapter 4 · asked 3×
- Valley curve design, 100 kmph, 1 in 40 · Transportation Engineering I, chapter 3 · asked 2×
- Francis runner design (40 m head, 10 m³/s) · Hydropower Engineering, chapter 7
- Level book, benchmark RL 100.00 at 3rd reading · Surveying I, chapter 5
All Irrigation and Drainage Engineering chapter 7 questions →