- 2068 Baisakh (old course) · 9 marks
Canal design discharge at 0, 1, 2, 3 km
Short answer
Rice demand (20 cm, 3 weeks) governs. Outlet demand per km is 1.157 m³/s. Working upstream: Q at 3 km = 4.64, 2 km = 6.04, 1 km = 7.50, 0 km = 9.02 m³/s, accounting for 4% channel loss per km and tail loss.
Calculate the design discharge of canal at 0, 1, 2 and 3 km from headworks. The GCA at the head of the canal is 40000 ha and after each km it is reduced by 6000 ha. Of this command, the CCA is only 70%. The intensity of irrigation for Wheat and Rice are 40% and 25% respectively. Assume total loss below 3 km = 0.4 m³/s; channel losses per km = 4% of discharge at beginning of each km; Kor period for wheat and Rice is 4 and 3 weeks respectively. Kor depth for wheat and rice are 14 and 20 cm respectively.
Assumptions
- Wheat and rice are grown in different seasons, so the canal is designed for the crop that needs the larger discharge (not their sum).
- Intensity is on CCA. The GCA at a km is the area still commanded below that point. Total loss below 3 km m³/s is a fixed loss added at 3 km; the channel loss in each km is 4% of the discharge at the beginning of that km.
Discharge per hectare of crop
Demand per hectare of GCA: wheat ; rice m³/s. Rice governs at every section.
Demand of outlets (rice) and discharge
| Section | GCA below (ha) | CCA (ha) | Rice area (ha) | Wheat area (ha) | Rice demand (m³/s) | Wheat demand (m³/s) |
|---|---|---|---|---|---|---|
| 0 km | 40,000 | 28,000 | 7,000 | 11,200 | 7.716 | 6.481 |
| 1 km | 34,000 | 23,800 | 5,950 | 9,520 | 6.559 | 5.509 |
| 2 km | 28,000 | 19,600 | 4,900 | 7,840 | 5.401 | 4.537 |
| 3 km | 22,000 | 15,400 | 3,850 | 6,160 | 4.244 | 3.565 |
Working from the tail end
Area served between two consecutive km marks ha GCA, with outlet demand m³/s.
Answer: Design discharge at 0, 1, 2, 3 km = 9.02, 7.50, 6.04, 4.64 m³/s (rice season governs).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Outlet discharge: wheat and rice, 10000 ha · Irrigation and Drainage Engineering, chapter 2
- Canal discharge for dry and wet crops (30000/40000 ha) · Irrigation and Drainage Engineering, chapter 2 · asked 2×
- GCA, CCA, NCA, intensity and pattern · Irrigation and Drainage Engineering, chapter 1 · asked 4×
- Duty and minor discharge, wheat 400 ha · Irrigation and Drainage Engineering, chapter 2
- Outlet discharge from kor table (rice, wheat) · Irrigation and Drainage Engineering, chapter 2
- Reservoir storage for wheat, rice, maize · Irrigation and Drainage Engineering, chapter 2
- 70 km, 40 MW line: regulation and zero-regulation pf · Power System Analysis I, chapter 6
- Design: 230 m head plant, 55 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 230 m head plant, 45 km line · Power Plant Design, chapter 4 · asked 12×
All Irrigation and Drainage Engineering chapter 4 questions →