- 2069 Bhadra · 3+3+3+3 marks
Headworks layout and cross sections
Short answer
The layout comprises weir bays, divide wall, under sluices, head regulator, guide bunds, and fish ladder. Under sluice crest is at river-bed levele with gates, aprons, and sheet piles. Head regulator crest is 1.2–2.0 m higher, with gates and cutoffs. The weir has a raised crest with shutters, sloping glacis, stilling basin, and pile cutoffs.
Draw a neat sketch of the general layout of a diversion head works and cross sections of under sluices, canal head regulator and weir with all details.
(a) General layout (plan)
Marginal bund <------ river flow ------>
___________________________________________
| |
| Weir bays | DW | Under- | DW | Head reg. |-> Canal
|~~~~~~~~~~~| | sluice | | (gated) |
| Fish ladder | pocket | silt excluder |
|_________________|________|_______________|
Guide bund (u/s) Guide bund (d/s)
Upstream apron / Downstream apron, pile cutoffs
(b) Section of undersluice
Pond level ~~~~~~~~~~~~~~~~~~~~~
gate |#| pier/bridge deck
______|#|___ ___ d/s apron
u/s crest (river-bed level) | |
apron ------------------------ | | stilling basin
sheet pile sheet pile
Crest at river-bed level; gate fixed above; u/s floor and cutoff; d/s hydraulic-jump floor with glacis, blocks and apron.
(c) Section of canal head regulator
Pond level ~~~~~~~~~~~~~~~
|#| gate deck
_______|#|______________
regulator crest (1.2-2.0 m above sluice crest)
u/s apron | floor | piles | d/s apron -> canal
Crest is higher than the undersluice crest; piers carry gates and a bridge; floor with u/s and d/s cutoffs.
(d) Section of weir
HFL ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Pond level ~~~~~~+--+ shutters
__________| |\___
u/s apron crest \ glacis d/s floor
________________________ ______ apron
sheet pile (cutoff) pile (cutoff)
Weir crest is raised by shutters above the permanent crest; the d/s sloping glacis dissipates energy by a hydraulic jump on the horizontal floor; u/s and d/s sheet piles control seepage; the aprons and filters protect against scour.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Components and layout of diversion headworks · Irrigation and Drainage Engineering, chapter 5 · asked 2×
- Headworks sketch, regulator section, protection works · Irrigation and Drainage Engineering, chapter 7
- Canal head regulator design, Q 200 · Irrigation and Drainage Engineering, chapter 7
- Canal head regulator design, Q 150 · Irrigation and Drainage Engineering, chapter 7
- Functions of head and cross regulator · Irrigation and Drainage Engineering, chapter 7 · asked 6×
- Functions of head regulator, cross regulator, escape · Irrigation and Drainage Engineering, chapter 7
- General requirements of functional RoR headworks · Hydropower Engineering, chapter 5 · asked 2×
- Under, over and balanced sections · Design of RCC Structure, chapter 4 · asked 6×
- Significance of under and over-reinforced sections · Design of RCC Structure, chapter 4
- Define balanced, under, over-reinforced sections · Design of RCC Structure, chapter 4
All Irrigation and Drainage Engineering chapter 5 questions →