General requirements of functional RoR headworks

Short answer

A sound RoR headworks must be stable against design floods, pass floods safely, deliver design discharge reliably, control sediment entry (high sill, undersluice, settling basin), exclude trash, have hydraulic efficiency, allow easy O&M, and meet environmental needs.

Explain the general requirements of a functional ROR headworks (what are the minimum performance standards of sound headworks?).

A RoR headworks takes the design discharge from the river without storage, so it must work reliably in both floods and low flows. The minimum standards of a sound headworks are:

  1. Stable and safe structure: designed for the 100-year flood (check for a higher flood); stable against sliding, overturning, uplift and piping; strong foundation with cut-offs and protection against scour.
  2. Adequate flood passage: spillway, undersluice and gates must pass the design flood with an acceptable afflux, without overtopping the banks or the flood walls.
  3. Dependable water supply: the intake must deliver the design discharge during the dry season, with the intake always submerged and no air entry or vortex; an environmental release is also kept in the river.
  4. Control of sediment: bed load is excluded by a high-level intake sill, an undersluice, a gravel trap and river training works; suspended sediment above the design size is removed in the settling basin. The sediment must not accumulate in front of the intake.
  5. Control of floating debris and trash: trash racks, trash booms, and a raking arrangement.
  6. Hydraulic efficiency: small head loss in the intake, a smooth flow transition and a low-turbulence approach.
  7. Operation and maintenance: gates and hoists easy to operate in floods, safe access, provision for flushing and inspection, and the arrangement for fish passage.
  8. Environment and economy: minimum impact on the river and fish, and a low cost relative to the energy produced.