- 2080 Bhadra · 2+2+2 marks
RoR headworks sketch; intake importance and location
Short answer
The intake is the link between river and waterway; it controls sediment, trash, head loss and flow safety. Locate it on the outer bank of a bend, in a stable reach, upstream of the weir next to the undersluice, away from confluences, where the river is narrow and access is good.
Draw a neat sketch showing the typical arrangement of components of a headworks of a RoR hydropower project. Write down the importance of its intake. How do you decide the location of an intake in a river?
Typical arrangement of the headworks
PLAN
river flow ==============================>
left bank wall
+-------------------------------------------+
| intake | undersluice | weir (spillway) |
| (side) | (gates) | ||||||||||||||||| |
+----+-----+-------------+--------------------+
| gravel trap
v fish ladder
approach canal --> settling basin --> headrace
SECTION through weir, undersluice and intake
pond level ~~~~~~~~~~~~~~~~~~~~~~~~~~
_____ weir crest ______
intake|rack |gate / \ stilling basin
sill |_____|-> canal / \____ apron
/////////// undersluice ///////// river bed
(sill 1.0-1.5 m above bed) flushing gate
Importance of the intake
- It is the link between the river and the waterway: the whole plant depends on it for the design discharge.
- It controls the quality of water entering the plant: sediment, gravel and trash that pass the intake reach the settling basin, tunnel and turbines and cause abrasion and blockage.
- It decides the head loss and so the energy generated; a poor intake gives vortices, air entry and heavy losses.
- It provides flow control and safety: gates close during floods and for maintenance.
- A wrongly placed intake can silt up, so its location and design decide the life and reliability of the headworks.
Deciding the location of an intake
- On the outer bank of a bend (about one-third to one-half way along the bend, downstream of the bend apex), where the helical flow carries bed load away from the opening; on a straight reach put it on the stable bank.
- In a stable reach with a good foundation, free of landslides, bank erosion and large boulder deposits.
- At a point that gives sufficient head and an easy alignment of the canal to the settling basin.
- Upstream of the weir and next to the undersluice so that the flushing current keeps the intake clear.
- Away from the confluence of tributaries, with good access and space for the gravel trap and settling basin.
- Where the river is narrow, to reduce the length and cost of the weir, and the flood level is limited.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR headworks arrangement and functional requirements · Hydropower Engineering, chapter 5 · asked 3×
- Parts of pressurized and non-pressurized RoR intake · Hydropower Engineering, chapter 5
- General requirements of functional RoR headworks · Hydropower Engineering, chapter 5 · asked 2×
- Hydropower intake sketch; minimizing head loss · Hydropower Engineering, chapter 5
- Optimizing plant capacity of a RoR project · Hydropower Engineering, chapter 3
- What is an intake? Functions and sketch · Hydropower Engineering, chapter 5 · asked 2×
- Intake definition, components, river intake · Water Supply Engineering, chapter 5 · asked 2×
- Site preparation components and facility arrangement · Construction Management, chapter 6
- High dam hydropower project components · Power Plant Design, chapter 3
- Intake site selection for RoR plant · Hydro Power, chapter 5