- 2072 Chaitra · 3+1 marks
Hydropower intake sketch; minimizing head loss
Short answer
Major components are trash rack, gate, sill, hoist deck, bell-mouth transition and undersluice. Minimize loss by low rack velocity 0.6-1.0 m/s, streamlined bars, bell-mouth entrance, gradual transitions, few gate slots, smooth lining and large bend radius.
Draw a neat sketch of a hydropower intake, showing major components. How do you minimize head loss in the intake?
Sketch of a hydropower intake (non-pressurized side intake of a RoR plant)
PLAN
river ==========================>
weir |||||||| undersluice
bank +----------------------+
| rack gate bell |--> gravel trap --> canal
+----------------------+
SECTION
pond ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
boom o | trash rack | gate | hoist deck
|###\ | |
|####\_______|______|=====> conduit
sill (1.0-1.5 m above bed) transition
///////////////////////////////////////// bed
Major components: trash boom, trash rack (inclined), intake sill, regulating gate with stop-log slot, hoist deck, bell-mouthed transition, flushing undersluice and the conduit to the gravel trap or settling basin.
Minimising head loss in the intake
Head loss reduces the net head and so the energy produced. It is reduced by:
- Low velocity at the trash rack (0.6-1.0 m/s) by providing a large rack area; the loss varies with .
- Streamlined bars (rounded or tapered upstream edges, of 0.76-1.8 instead of 2.42), larger spacing, and regular raking to avoid clogging.
- Bell-mouthed, rounded entrance instead of a sharp-edged entry (loss coefficient 0.05-0.1 instead of 0.5).
- Gradual transitions (contraction or expansion not steeper than about 1:5) and smooth curved wing walls.
- Few gate slots and piers, and a fully open gate in operation.
- Smooth lining, short conduit and large bend radius; avoiding sharp bends at the entry.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Side intake sketch; trash rack loss · Hydropower Engineering, chapter 5
- Types of hydropower plants by head, turbine, load · Hydropower Engineering, chapter 2
- RoR headworks sketch; intake importance and location · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- What is an intake? Functions and sketch · Hydropower Engineering, chapter 5 · asked 2×
- Requirements of a good intake; types in Nepal · Hydropower Engineering, chapter 5
- Layout of hydropower scheme components · Hydro Power, chapter 5
- High dam hydropower project components · Power Plant Design, chapter 3
- Intake definition, components, river intake · Water Supply Engineering, chapter 5 · asked 2×
- Intake components and site factors · Water Supply Engineering, chapter 5