- 2076 Chaitra · 2+6 marks
Parts of pressurized and non-pressurized RoR intake
Short answer
Non-pressurized intake parts: approach channel, sill, trash rack, gate, transition, gravel trap and undersluice. Pressurized intake parts: trash rack, bell-mouthed entrance, minimum submergence with anti-vortex device, service and emergency gates, air vent, and transition to the pressure tunnel.
What are the main parts of non-pressurized and pressurized ROR intake? Present the general arrangement of such intakes in neat proportionate sketches.
Main parts of a non-pressurized RoR intake
- Approach channel / river training with guide wall.
- Intake sill (about 1.0-1.5 m above the undersluice or river bed) to stop bed load.
- Trash rack (inclined at 70-80°) with a trash boom in front.
- Gate (regulating gate) with a stop-log slot and hoist deck.
- Transition / bell-mouth to the gravel trap and the approach canal / settling basin.
- Flushing (undersluice) gate and flood wall.
NON-PRESSURIZED INTAKE (section)
pond ~~~~~~~~~~~~~~~~~~~~~~~
boom | hoist deck
--o-- | |gate
trash |##\ | |
rack |## \| |_______ free flow --> canal
sill |_______|
///////////////////////////// river bed
Main parts of a pressurized intake
- Approach and trash rack (inclined or vertical, large area, with rake).
- Bell-mouthed entrance (to reduce entry loss).
- Minimum submergence below the lowest operating level, with an anti-vortex device.
- Emergency gate and service gate in a gate shaft, with an air vent behind the gate.
- Transition from rectangular to the circular pressure tunnel/penstock.
PRESSURIZED INTAKE (section)
min WL ~~~~~~~~~~~~~~~~~~~~~~~~
| air vent
rack |## |gate|
S |## | |
_______|bell-|____> pressure tunnel (full)
mouth
Proportions: rack velocity 0.8-1.0 m/s; the bell-mouth length is about 1.5-2 times the conduit height; the submergence is chosen by the vortex criterion .
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Pressurized vs non-pressurized intakes · Hydropower Engineering, chapter 5 · asked 2×
- RoR headworks arrangement and functional requirements · Hydropower Engineering, chapter 5 · asked 3×
- RoR headworks sketch; intake importance and location · Hydropower Engineering, chapter 5
- Common RoR intakes in Nepal; site selection · Hydropower Engineering, chapter 5 · asked 2×
- Powerhouse general arrangement and dimensions · Hydropower Engineering, chapter 8 · asked 3×
- General requirements of functional RoR headworks · Hydropower Engineering, chapter 5 · asked 2×
- General river intake and site selection · Water Supply Engineering, chapter 5 · asked 3×
- Intake site selection for RoR plant · Hydro Power, chapter 5
- General parts of doors and windows · Building Technology, chapter 6 · asked 2×
- Classification and main parts of centre lathe · Workshop Technology, chapter 6