Skip to main content

Kennedy design: Q 10, n 0.0245

Short answer

By trial: assume depth, compute V0=0.55D^0.64, then Manning's V= (1/0.0245)R^(2/3)√0.0002. Match occurs at D=0.89 m. Required bed width 21.6 m, side slope 0.5:1, velocity 0.51 m/s, bed slope 1/5000.

Design a canal using Kennedy formulation with following data: Q = 10 cumec, Manning roughness coefficient = 0.0245, slope of bed = 0.0002, m = 1 and side slope of canal 0.5:1 (H:V).

Given: Q=10 m3/sQ = 10\ \text{m}^3/\text{s}, n=0.0245n = 0.0245, S=0.0002S = 0.0002 (1 in 5000), m=1m = 1, side slope 0.5H:1V.

Method (Kennedy's silt theory, trial and error)

  1. Assume depth DD.
  2. Kennedy's critical velocity: V0=0.55 m D0.64V_0 = 0.55\,m\,D^{0.64}.
  3. Area A=Q/V0A = Q/V_0, bed width B=(A−zD2)/DB = (A - zD^2)/D, perimeter P=B+2D1+z2P = B + 2D\sqrt{1+z^2}, R=A/PR = A/P.
  4. Find VV from Manning's formula, V=1nR2/3S1/2V = \frac{1}{n}R^{2/3}S^{1/2}.
  5. Repeat until V=V0V = V_0.

Trials

D (m)V0V_0 (m/s)A (m²)B (m)P (m)R (m)V (m/s)
0.700.43822.8432.2833.850.6750.444
0.800.47720.9725.8227.610.7600.481
0.890.51019.5921.5723.560.8320.510
1.000.55018.1817.6819.920.9130.543

The velocities VV and V0V_0 become equal at D≈0.89D \approx 0.89 m, so this is the required depth.

Final section

Adopt D=0.89D = 0.89 m, B=21.6B = 21.6 m.

A=(21.6+0.5×0.89)×0.89=19.62 m2P=21.6+2×0.891+0.52=23.59 m,R=0.832 mV=0.511 m/s,V0=0.55×1×0.890.64=0.510 m/sQ=AV=19.62×0.511=10.02 m3/s\begin{aligned} A &= (21.6 + 0.5\times 0.89)\times 0.89 = 19.62\ \text{m}^2 \\ P &= 21.6 + 2\times 0.89\sqrt{1+0.5^2} = 23.59\ \text{m},\quad R = 0.832\ \text{m} \\ V &= 0.511\ \text{m/s},\quad V_0 = 0.55\times 1\times 0.89^{0.64} = 0.510\ \text{m/s} \\ Q &= AV = 19.62\times 0.511 = 10.02\ \text{m}^3/\text{s} \end{aligned}

Answer: Depth D≈0.89D \approx 0.89 m, bed width B≈21.6B \approx 21.6 m, side slope 0.5H:1V, bed slope 1 in 5000, velocity ≈0.51\approx 0.51 m/s (discharge check 10.0 m³/s, i.e. within about 0.2% of the design value).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Irrigation and Drainage Engineering chapter 4 questions →