Kennedy design: Q 40, n 0.018

Short answer

Depth 3.78 m, bed width 6.3 m, side slopes 0.5H:1V, bed slope 1 in 5000, velocity 1.29 m/s (discharge 39.9 m³/s).

Design a canal using Kennedy's formula with the following data: Q = 40 m³/s, Manning's roughness coefficient (n) = 0.018, bed slope(s) = 0.00020, m = 1.0 and side slope = 0.5:1 (H:V).

Given: Q=40 m3/sQ = 40\ \text{m}^3/\text{s}, n=0.018n = 0.018, S=0.0002S = 0.0002 (1 in 5000), m=1.0m = 1.0, side slope 0.5H:1V.

Method (Kennedy's silt theory, trial and error)

  1. Assume depth DD.
  2. Kennedy's critical velocity: V0=0.55 m D0.64V_0 = 0.55\,m\,D^{0.64}.
  3. Area A=Q/V0A = Q/V_0, bed width B=(A−zD2)/DB = (A - zD^2)/D, perimeter P=B+2D1+z2P = B + 2D\sqrt{1+z^2}, R=A/PR = A/P.
  4. Find VV from Manning's formula, V=1nR2/3S1/2V = \frac{1}{n}R^{2/3}S^{1/2}.
  5. Repeat until V=V0V = V_0.

Trials

D (m)V0V_0 (m/s)A (m²)B (m)P (m)R (m)V (m/s)
3.001.11136.0010.5017.212.0921.285
3.401.20433.238.0715.682.1201.297
3.781.28831.056.3314.782.1011.289
4.201.37829.034.8114.202.0441.265

The velocities VV and V0V_0 become equal at D≈3.78D \approx 3.78 m, so this is the required depth.

Final section

Adopt D=3.78D = 3.78 m, B=6.3B = 6.3 m.

A=(6.3+0.5×3.78)×3.78=30.96 m2P=6.3+2×3.781+0.52=14.75 m,R=2.099 mV=1.288 m/s,V0=0.55×1.0×3.780.64=1.288 m/sQ=AV=30.96×1.288=39.87 m3/s\begin{aligned} A &= (6.3 + 0.5\times 3.78)\times 3.78 = 30.96\ \text{m}^2 \\ P &= 6.3 + 2\times 3.78\sqrt{1+0.5^2} = 14.75\ \text{m},\quad R = 2.099\ \text{m} \\ V &= 1.288\ \text{m/s},\quad V_0 = 0.55\times 1.0\times 3.78^{0.64} = 1.288\ \text{m/s} \\ Q &= AV = 30.96\times 1.288 = 39.87\ \text{m}^3/\text{s} \end{aligned}

Answer: Depth D≈3.78D \approx 3.78 m, bed width B≈6.3B \approx 6.3 m, side slope 0.5H:1V, bed slope 1 in 5000, velocity ≈1.29\approx 1.29 m/s (discharge check 39.9 m³/s, i.e. within about 0.3% of the design value).