Skip to main content

Kennedy: Q 30, V 1.75 m/s

Short answer

Full supply depth 1.56 m, bed width 9.39 m, bed slope 1 in 1339 (0.000747). Note: critical velocity ratio m=2.39 exceeds typical alluvial range; section suitable only for lined or well-protected channel.

An irrigation channel is to carry a full supply discharge of 30 m³/s at a velocity of 1.75 m/s. The side slopes are to be 1:1. The ratio of full supply depth to bed width is to be 1:6. Assuming the Manning's n as 0.018, calculate the full supply depth, bed width, and bed slope of the channel using Kennedy's method.

Given: Q=30 m3/sQ = 30\ \text{m}^3/\text{s}, V=1.75V = 1.75 m/s, side slope 1H:1V, D:B=1:6D:B = 1:6, n=0.018n = 0.018.

Step 1: Area

A=QV=301.75=17.143 m2A = \frac{Q}{V} = \frac{30}{1.75} = 17.143\ \text{m}^2

Step 2: Depth and bed width

With B=6DB = 6D and z=1z = 1:

A=(B+zD)D=(6D+D)D=7D2D=17.143/7=1.565 m≈1.56 mB=6D=9.39 m\begin{aligned} A &= (B + zD)D = (6D + D)D = 7D^2 \\ D &= \sqrt{17.143/7} = 1.565\ \text{m} \approx 1.56\ \text{m} \\ B &= 6D = 9.39\ \text{m} \end{aligned}

Step 3: Bed slope (Manning)

A=(9.39+1.56)×1.56=17.08 m2P=B+2D2=9.39+2×1.56×1.4142=13.80 mR=AP=1.238 mS=(VnR2/3)2=(1.75×0.0181.2382/3)2=0.000747=11339\begin{aligned} A &= (9.39 + 1.56)\times 1.56 = 17.08\ \text{m}^2 \\ P &= B + 2D\sqrt{2} = 9.39 + 2\times 1.56\times 1.4142 = 13.80\ \text{m} \\ R &= \frac{A}{P} = 1.238\ \text{m} \\ S &= \left(\frac{Vn}{R^{2/3}}\right)^2 = \left(\frac{1.75\times 0.018}{1.238^{2/3}}\right)^2 = 0.000747 = \frac{1}{1339} \end{aligned}

Step 4: Kennedy check

Critical velocity V0=0.55D0.64=0.55×1.560.64=0.731V_0 = 0.55D^{0.64} = 0.55\times 1.56^{0.64} = 0.731 m/s, so the critical velocity ratio is m=V/V0=2.39m = V/V_0 = 2.39. This is much higher than the usual 0.8-1.2, so a velocity of 1.75 m/s suits only a stable boundary (a lined or well-protected channel), not an ordinary alluvial earth canal.

Answer: Full supply depth ≈1.56\approx 1.56 m, bed width ≈9.39\approx 9.39 m, bed slope ≈1\approx 1 in 1339 (0.000747).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Irrigation and Drainage Engineering chapter 4 questions →