Kennedy design: Q 50, m 0.9

Short answer

Assume depth D, compute V0 = 0.55×0.9×D^0.64, then A = 50/V0, B, P, R, and Kutter’s V. Trial until V ≈ V0 yields D ≈ 3.67 m, bed width B ≈ 10.1 m, velocity ≈ 1.14 m/s.

Design an irrigation channel with side slope 0.5H:1V to carry a discharge of 50 m³/s at a slope of 1 in 5000. Take Kutter's n = 0.0225 and C.V.R (m) = 0.9.

Given: Q=50 m3/sQ = 50\ \text{m}^3/\text{s}, n=0.0225n = 0.0225, S=0.0002S = 0.0002 (1 in 5000), m=0.9m = 0.9, side slope 0.5H:1V. Kutter's formula is used because Kutter's nn is specified.

Method (Kennedy's silt theory, trial and error)

  1. Assume depth DD.
  2. Kennedy's critical velocity: V0=0.55 m D0.64V_0 = 0.55\,m\,D^{0.64}.
  3. Area A=Q/V0A = Q/V_0, bed width B=(A−zD2)/DB = (A - zD^2)/D, perimeter P=B+2D1+z2P = B + 2D\sqrt{1+z^2}, R=A/PR = A/P.
  4. Find VV from Kutter's formula, V=CRSV = C\sqrt{RS} with C=23+1n+0.00155S1+(23+0.00155S)nRC = \dfrac{23 + \frac{1}{n} + \frac{0.00155}{S}}{1 + \left(23 + \frac{0.00155}{S}\right)\frac{n}{\sqrt R}}.
  5. Repeat until V=V0V = V_0.

Trials

D (m)V0V_0 (m/s)A (m²)B (m)P (m)R (m)V (m/s)
2.900.97851.1016.1722.662.2561.093
3.301.06347.0512.6119.992.3541.124
3.671.13843.9510.1418.352.3961.137
4.001.20241.608.4017.342.3981.138

The velocities VV and V0V_0 become equal at D≈3.67D \approx 3.67 m, so this is the required depth.

Final section

Adopt D=3.67D = 3.67 m, B=10.1B = 10.1 m.

A=(10.1+0.5×3.67)×3.67=43.80 m2P=10.1+2×3.671+0.52=18.31 m,R=2.393 mV=1.137 m/s,V0=0.55×0.9×3.670.64=1.138 m/sQ=AV=43.80×1.137=49.78 m3/s\begin{aligned} A &= (10.1 + 0.5\times 3.67)\times 3.67 = 43.80\ \text{m}^2 \\ P &= 10.1 + 2\times 3.67\sqrt{1+0.5^2} = 18.31\ \text{m},\quad R = 2.393\ \text{m} \\ V &= 1.137\ \text{m/s},\quad V_0 = 0.55\times 0.9\times 3.67^{0.64} = 1.138\ \text{m/s} \\ Q &= AV = 43.80\times 1.137 = 49.78\ \text{m}^3/\text{s} \end{aligned}

Answer: Depth D≈3.67D \approx 3.67 m, bed width B≈10.1B \approx 10.1 m, side slope 0.5H:1V, bed slope 1 in 5000, velocity ≈1.14\approx 1.14 m/s (discharge check 49.8 m³/s, i.e. within about 0.4% of the design value).

✓ Answer checked by Claude Opus 5.5 (high effort)