- 2064 Kartik (old course) · 8 marks
Khosla: HGL and d/s floor thickness, three piles
Short answer
Between intermediate and d/s piles, pressure drops linearly from 65% to 55% of total head. With 10 m net head, required floor thickness at 20 m is 5.00 m and at 30 m is 4.79 m.
Following corrected φ values were computed from Khosla's curves in a barrage placed on permeable foundation. U/S sheet pile: φE1 = 100%, φD1 = 90%, φC1 = 85% Intermediate pile: φE2 = 80%, φD2 = 70%, φC2 = 65% D/S sheet pile: φE3 = 55%, φD3 = 45%, φC3 = 0% Distance between the U/S and intermediate piles is 20 m and that between the intermediate and D/S piles is 40 m. Assuming that the floor is horizontal throughout, draw the HGL for the subsoil flow. If the net head is 10 m, determine the thickness of D/S floor at a distance of 20 m and 30 m away from the intermediate sheet pile. Assume G for the floor material equal to 2.2. The symbols has usual meanings.
Given
Corrected pressures (percent of head): u/s pile , , ; intermediate pile , , ; d/s pile , , . Net head m, . Piles at 0, 20 m and 60 m (20 m and 40 m apart). The floor is horizontal, with its level taken as the datum (d/s water level).
Hydraulic gradient line
The HGL is a vertical drop across each pile and a straight line along the floor between piles:
| Point | Pressure (%) | Head above floor (m) |
|---|---|---|
| 100 | 10.0 | |
| 90 | 9.0 | |
| 85 | 8.5 | |
| 80 | 8.0 | |
| 70 | 7.0 | |
| 65 | 6.5 | |
| 55 | 5.5 | |
| 45 | 4.5 | |
| 0 | 0 |
100 E1 |#############################
90 D1 |##########################
85 C1 |######################## (floor, 20 m)
80 E2 |#######################
70 D2 |####################
65 C2 |################## (floor, 40 m)
55 E3 |################
45 D3 |#############
0 C3 |
Thickness of the d/s floor (between intermediate and d/s piles)
On the 40 m floor the pressure falls linearly from 65% at to 55% at :
Unbalanced head and thickness :
| Distance from intermediate pile | (%) | (m) | (m) |
|---|---|---|---|
| 20 m | 60.0 | 6.00 | 5.00 |
| 30 m | 57.5 | 5.75 | 4.79 |
Answer: Required floor thickness m at 20 m and m at 30 m from the intermediate sheet pile.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Khosla: barrage HGL and floor thickness · Irrigation and Drainage Engineering, chapter 5
- Khosla: cistern floor thickness from corrected phi · Irrigation and Drainage Engineering, chapter 5
- Khosla: two piles, floor at A, B, C, exit 0.2 · Irrigation and Drainage Engineering, chapter 5
- Khosla's method for barrage floor design · Irrigation and Drainage Engineering, chapter 5
- Khosla: uplift, HGL, thickness, exit gradient 1/5 · Irrigation and Drainage Engineering, chapter 5
- Khosla (analytical): uplift and d/s floor thickness · Irrigation and Drainage Engineering, chapter 5
- Pile spacing for 100% efficiency, 16 piles · Foundation Engineering, chapter 8 · asked 2×
All Irrigation and Drainage Engineering chapter 5 questions →