Skip to main content

Lacey design: Q 20, f 1.5

Short answer

For Q=20 m³/s, f=1.5: V=0.83 m/s, A=24.16 m², R=1.14 m, P=21.24 m, S=1/2800. For trapezoid with side slope 0.5H:1V, solving yields bed width 18.4 m and depth 1.27 m.

Design a canal using Lacey's theory carrying a discharge of 20 cumec, silt factor = 1.5 and side slope is 0.5:1 (H:V).

Lacey's regime values

Given: Q=20 m3/sQ = 20\ \text{m}^3/\text{s}, f=1.500f = 1.500, side slope 0.5H:1V.

V=(Qf2140)1/6=(20×1.5002140)1/6=0.828 m/sA=QV=200.828=24.16 m2R=5V22f=5×0.82822×1.500=1.142 mP=4.75Q=4.7520=21.24 mS=f5/33340 Q1/6=1.5005/33340×201/6=0.000357=12800\begin{aligned} V &= \left(\frac{Q f^2}{140}\right)^{1/6} = \left(\frac{20\times 1.500^2}{140}\right)^{1/6} = 0.828\ \text{m/s} \\ A &= \frac{Q}{V} = \frac{20}{0.828} = 24.16\ \text{m}^2 \\ R &= \frac{5V^2}{2f} = \frac{5\times 0.828^2}{2\times 1.500} = 1.142\ \text{m} \\ P &= 4.75\sqrt{Q} = 4.75\sqrt{20} = 21.24\ \text{m} \\ S &= \frac{f^{5/3}}{3340\,Q^{1/6}} = \frac{1.500^{5/3}}{3340\times 20^{1/6}} = 0.000357 = \frac{1}{2800} \end{aligned}

Trapezoidal section

For side slope z=0.5z = 0.5: A=(B+zD)DA = (B + zD)D and P=B+2D1+z2=B+2.2361DP = B + 2D\sqrt{1+z^2} = B + 2.2361D.

Eliminating BB:

1.7361 D2−21.24 D+24.16=0D=21.24−21.242−4×1.7361×24.162×1.7361=1.269 mB=P−2.2361D=21.24−2.2361×1.269=18.40 m\begin{aligned} 1.7361\,D^2 - 21.24\,D + 24.16 &= 0 \\ D &= \frac{21.24 - \sqrt{21.24^2 - 4\times 1.7361\times 24.16}}{2\times 1.7361} = 1.269\ \text{m} \\ B &= P - 2.2361D = 21.24 - 2.2361\times 1.269 = 18.40\ \text{m} \end{aligned}

(The other root of the quadratic gives a very deep, narrow section, so the smaller root is taken.)

Check: A=(18.40+0.5×1.269)×1.269=24.16 m2A = (18.40 + 0.5\times 1.269)\times 1.269 = 24.16\ \text{m}^2 against required 24.16 m2\text{m}^2.

Answer: Bed width B≈18.4B \approx 18.4 m, depth of water D≈1.27D \approx 1.27 m, side slope 0.5H:1V, bed slope S=1S = 1 in 2800 (0.000357), velocity V=0.83V = 0.83 m/s, hydraulic mean radius R=1.14R = 1.14 m.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Irrigation and Drainage Engineering chapter 4 questions →