- 2078 Chaitra · 5 marks
Silt excluder design, Q 200 cumec
Short answer
Assume tunnel discharge 40 m³/s (20% of 200). Height = (227.35−225.25)−0.30 = 1.80 m. Area = 40/2.5 = 16 m², width = 8.89 m. Provide 3 tunnels each 3.0 m wide with two 0.6 m piers to fit 10.2 m bay. Velocity = 2.47 m/s. Result: 3 tunnels 3.0 m×1.80 m, piers 0.6 m, carrying 40 m³/s at 2.47 m/s.
Design a silt excluder for the diversion head works having following data: Full supply discharge of canal = 200 m³/sec; Crest level of undersluices = 225.25 m; Crest level of head regulator = 227.35 m; Bay width of undersluices = 10.2 m.
Given and assumptions
Canal discharge m³/s; undersluice crest level (tunnel floor) m; head regulator crest level m (tunnel roof level); bay width of the undersluices m.
Assumed: discharge through the tunnels = 20% of the canal discharge; roof slab thickness 0.3 m; tunnel velocity about 2.5 m/s (non-silting); pier thickness 0.6 m.
Design
- Discharge in tunnels
- Height of tunnels
Difference of crest levels m. Subtracting the roof slab of m:
- Area of tunnels
- Total width of tunnels
- Number of tunnels. Provide 3 tunnels of 3.0 m each and 2 piers of 0.6 m:
which fits exactly in the bay width of 10.2 m. Area provided m².
- Velocity check
This is very slightly below 2.5 m/s (about 1% less), which is practically acceptable; it lies within the usual tunnel velocity range of 2-3 m/s, so the silt will be carried through the tunnels.
Section
regulator crest 227.35 -----------------------
roof slab (0.30) ===================
tunnel height 1.80 | | | | | |
undersluice crest 225.25 -----------------------
3 tunnels x 3.0 m + 2 piers x 0.6 m = 10.2 m
Answer: 3 tunnels, each 3.0 m wide and 1.80 m high (roof 227.35 m, floor 225.25 m), piers 0.6 m, carrying 40 m³/s at about 2.47 m/s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Canal head regulator design, Q 200 · Irrigation and Drainage Engineering, chapter 7
- Canal head regulator design, Q 150 · Irrigation and Drainage Engineering, chapter 7
- Weir waterway and crest levels, 16000 m3/s · Irrigation and Drainage Engineering, chapter 5
- Design steps of a silt excluder · Irrigation and Drainage Engineering, chapter 5
- Design cross and head regulator, Q 125 · Irrigation and Drainage Engineering, chapter 7
- Silt excluder, silt ejector, sediment control · Irrigation and Drainage Engineering, chapter 5 · asked 10×
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- Design zener shunt regulator (5.6 V, 15 V supply) · Electronics Devices and Circuit, chapter 6
- Design: 310 m head plant, HV breaker · Power Plant Design, chapter 4 · asked 3×
All Irrigation and Drainage Engineering chapter 5 questions →