- 2076 Bhadra · 6 marks
Design steps of a silt excluder
Short answer
Fix crest levels, set tunnel discharge (20% of canal), velocity 2.5–3 m/s. Compute area, height, width, number of tunnels (2–4) fitting the undersluice bay. Length equals head regulator width plus transition; check hydraulics with orifice formula; design roof, floor, and entrance/exit transitions.
Describe briefly the design steps of a silt excluder with neat sketches.
A silt excluder is a set of tunnels built under the canal head regulator in the river pocket that passes the silty bottom water to the river through the undersluices.
Design steps
- Fix the crest levels. Undersluice crest level (river-bed level) and the head-regulator crest level, normally 1.2-2.1 m higher. The difference gives the available tunnel height (minus roof slab thickness 0.2-0.3 m).
- Discharge through the tunnels. Take 20% of the canal discharge (Garg), or the silt-carrying capacity needed.
- Tunnel velocity. Fix 2.5-3 m/s (non-silting, non-erosive). Required area .
- Height of tunnels (regulator crest level undersluice crest level) roof slab thickness. Total tunnel width .
- Number and width of tunnels. Adopt 2-4 tunnels with 0.5-0.75 m thick piers so that the total width equals the bay of the undersluice.
- Length of tunnels equals the width of the head regulator plus the transition, with a gently sloping floor to improve flow.
- Hydraulic checks. The head causing flow comes from the pond to the tailwater in the river (difference of levels), checked by the orifice formula .
- Structural design. Roof slab, piers and floor are designed for water load; the tunnel floor, piles and cut-offs are checked for uplift.
- Entrance and exit. Wing walls with smooth transitions, so that the silt does not enter the canal; d/s outlet to the sluiceway with an apron.
SECTION
pond level ~~~~~~~~~~~~~~~~~~~~~~~~~~~
regulator crest ____________ (roof of tunnel)
---> clear water | roof slab |--> canal
silty water ---> [ tunnel ]---> to river
undersluice crest level ____________
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Silt excluder design, Q 200 cumec · Irrigation and Drainage Engineering, chapter 5
- Silt excluder, silt ejector, sediment control · Irrigation and Drainage Engineering, chapter 5 · asked 10×
- Functions of divide wall, undersluice, silt devices · Irrigation and Drainage Engineering, chapter 5
- Design steps of a guide bund · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Bell's guide bund plan, sections, design steps · Irrigation and Drainage Engineering, chapter 6
- Design steps of doubly reinforced section · Design of RCC Structure, chapter 4
- Steps of grounding mat design · Power Plant Design, chapter 4 · asked 5×
- Design steps and criteria of distribution system · Water Supply Engineering, chapter 7 · asked 3×
- Design steps of superelevation · Transportation Engineering I, chapter 3 · asked 3×
All Irrigation and Drainage Engineering chapter 5 questions →