- 2079 Asoj · 3+5 marks
Bell's guide bund plan, sections, design steps
Short answer
Bell’s bund is a guide embankment with curved heads to give axial flow. Design steps: compute waterway W=4.75 sqrt(Q), silt factor f=1.76 sqrt(d); upstream shank 1–1.5W, tail 0.2–0.5W; curved head radius 0.5W, sweep 120–145°; top level HFL+1.5 m, width 6 m; pitching t=0.06 Q^(1/3); scour R=0.47(Q/f)^(1/3); apron width 1.5D', launched thickness 1.5t.
Draw a neat plan and sections of a Bell's Bund and give salient steps of its design procedure.
A Bell's bund is a guide bund (guide bank) on the pattern recommended by Bell, in which a pair of embankments, with curved heads upstream and short tails downstream, is laid symmetrically about the axis of a bridge or barrage so that the river approaches the waterway axially. The waterway is based on Lacey's regime width.
Plan and sections (3 marks)
U/S D/S
______________________________ | ____
/ upstream shank 1.0-1.5 W \ | / \ tail
( curved head, R = 0.5W, )=|=( ) 0.25 W
\ sweep 120 deg / | \____/
\_____________________________/ |
waterway W (Lacey) axis of bridge
Section at shank Section at nose
__6 m__ __6 m__
/ \ HFL+1.5 / \
HFL/_________\ 2:1 HFL/__________\ 3:1
/ pitching t \ / pitching t \
/___ apron ____\ (1.5R) /____ apron (2R) ___\
Design steps (5 marks)
- Design discharge , HFL, bed level and median grain size .
- Silt factor , and waterway .
- Length of upstream shank to , downstream tail to .
- Radius of upstream curved head about with sweep to ; tail with a smaller radius, sweep about .
- Top level HFL m, top width 6 m, side slopes 2:1.
- Pitching thickness .
- Scour depth ; max scour below HFL: at nose, at shank.
- Launching apron: depth below bed scour depth flood depth, width , launched thickness .
- Draw plan and sections.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design steps of a guide bund · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Bell's waterway and guide bund, 7500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund with plan, section, nose; 2500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 7000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Design steps of flanged beam sections · Design of RCC Structure, chapter 4 · asked 2×
- Powerhouse plan and sections (Francis, 10 MW) · Hydropower Engineering, chapter 8
- Design steps and criteria of distribution system · Water Supply Engineering, chapter 7 · asked 3×
- Column slab base: sketch and design steps · Design of Steel and Timber Structure, chapter 6 · asked 3×
All Irrigation and Drainage Engineering chapter 6 questions →