Short answer

Bell’s bund is a guide embankment with curved heads to give axial flow. Design steps: compute waterway W=4.75 sqrt(Q), silt factor f=1.76 sqrt(d); upstream shank 1–1.5W, tail 0.2–0.5W; curved head radius 0.5W, sweep 120–145°; top level HFL+1.5 m, width 6 m; pitching t=0.06 Q^(1/3); scour R=0.47(Q/f)^(1/3); apron width 1.5D', launched thickness 1.5t.

Draw a neat plan and sections of a Bell's Bund and give salient steps of its design procedure.

A Bell's bund is a guide bund (guide bank) on the pattern recommended by Bell, in which a pair of embankments, with curved heads upstream and short tails downstream, is laid symmetrically about the axis of a bridge or barrage so that the river approaches the waterway axially. The waterway is based on Lacey's regime width.

Plan and sections (3 marks)

 U/S                                       D/S
   ______________________________   |   ____
  /   upstream shank 1.0-1.5 W   \  |  /    \ tail
 (  curved head, R = 0.5W,        )=|=(      ) 0.25 W
  \ sweep 120 deg                 /  |  \____/
   \_____________________________/   |
         waterway W (Lacey)        axis of bridge
 Section at shank              Section at nose
     __6 m__                      __6 m__
    /       \  HFL+1.5           /        \
 HFL/_________\ 2:1          HFL/__________\ 3:1
  / pitching t \                / pitching t \
 /___ apron ____\ (1.5R)    /____ apron (2R) ___\

Design steps (5 marks)

  1. Design discharge QQ, HFL, bed level and median grain size dd.
  2. Silt factor f=1.76dmmf = 1.76\sqrt{d_{mm}}, and waterway W=4.75QW = 4.75\sqrt{Q}.
  3. Length of upstream shank 1.01.0 to 1.5W1.5W, downstream tail 0.20.2 to 0.5W0.5W.
  4. Radius of upstream curved head about 0.5W0.5W with sweep 120120 to 145∘145^\circ; tail with a smaller radius, sweep about 45∘45^\circ.
  5. Top level == HFL +1.5+ 1.5 m, top width 6 m, side slopes 2:1.
  6. Pitching thickness t=0.06Q1/3t = 0.06Q^{1/3}.
  7. Scour depth R=0.47(Q/f)1/3R = 0.47(Q/f)^{1/3}; max scour below HFL: 2R2R at nose, 1.5R1.5R at shank.
  8. Launching apron: depth below bed D′=D' = scour depth −- flood depth, width 1.5D′1.5D', launched thickness 1.5t1.5t.
  9. Draw plan and sections.

✓ Answer checked by Claude Opus 5.5 (high effort)