- 2065 Shrawan (old course) · 6 marks
Guide bund design, 7000 m3/s
Short answer
Waterway W=4.75√7000≈397 m, shank 1.25W=496 m, tail 99 m. Pitching t=1.15 m. Scour R=8.71 m. Straight apron width 1.5×8.06=12.10 m, depth below bed 8.06 m; nose width 1.5×12.42=18.63 m, depth 12.42 m; laid thickness √5 t≈2.57 m.
Design a guide bund for a flood discharge of 7000 cumecs, the high flood depth is 5 m and the silt factor is 1.1.
Data and design basis
- Silt factor given:
- Flood depth: m
- Design discharge for scour/apron: m³/s
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 17.42 m | 12.42 m | 18.63 m |
| Shank (straight) | 1.5R | 13.06 m | 8.06 m | 12.10 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Lacey waterway | 397.41 m (adopt 397 m) |
| Length of guide bund (u/s) | 496 m; d/s tail 99 m |
| Pitching thickness | 1.15 m |
| Apron at shank: width / thickness | 12.10 m / 1.72 m launched (2.57 m laid) |
| Apron at nose: width / thickness | 18.63 m / 1.72 m launched (2.57 m laid) |
Sketches
Plan of guide bunds:
U/S D/S
bridge / weir axis
Shank (straight) |
________________________________ | ___
/ 1.0-1.5 W upstream \ | / \ tail
\________________________________/=|=\___/ 0.25 W
curved head |
R, sweep 120 deg <-- waterway W -->
________________________________ | ___
/ \ | / \
\________________________________/=|=\___/
Section at the shank (straight portion):
top width 6 m
___________ <- HFL + 1.5 m
/ \
HFL ---/-------------\--- 2:1 slopes
/ pitching t \
bed__/__ filter ______ \___
\_ launching apron _/ (launches at 2:1)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bund components and drawings, 6000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund: length, curved head, apron; 4500 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Gabion guide bund and apron, 3000 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Guide bank design, 6500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Gumbel design flood, factor of safety 1.3, 45-year life · Engineering Hydrology, chapter 6
- Return period of 350 m3/s design flood by Gumbel · Engineering Hydrology, chapter 6 · asked 2×
- Gumbel design flood, safety factor, confidence limits · Engineering Hydrology, chapter 6