- 2066 Bhadra (old course) · 5+3 marks
Guide bund components and drawings, 6000 m3/s
Short answer
Lacey waterway W=4.75√Q≈368 m, upstream shank 1.25W=460 m, downstream 0.25W=92 m. Pitching t=0.06Q^(1/3)=1.09 m. Scour depth R=8.27 m. Apron: straight portion width 1.5×7.41=11.12 m, depth below bed 7.41 m; nose width 1.5×11.55=17.32 m, depth 11.55 m; laid thickness √5 t≈2.44 m.
Design the following components of a guide bund for a river discharge of 6000 m³/s and silt factor as 1.1. Take HFL = 150 m, Bed level = 145 m. (i) Length of guide bund (ii) Thickness of pitching (iii) Width of launching apron (iv) Depth of launching apron. Using the design data, draw the following: A) Plan of guide bank B) Section at shank and C) Section at u/s curved head.
Data and design basis
- Silt factor given:
- Flood depth above bed: m
- Design discharge for scour/apron: m³/s
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 16.55 m | 11.55 m | 17.32 m |
| Shank (straight) | 1.5R | 12.41 m | 7.41 m | 11.12 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Lacey waterway | 367.93 m (adopt 368 m) |
| Length of guide bund (u/s) | 460 m; d/s tail 92 m |
| Pitching thickness | 1.09 m |
| Apron at shank: width / thickness | 11.12 m / 1.64 m launched (2.44 m laid) |
| Apron at nose: width / thickness | 17.32 m / 1.64 m launched (2.44 m laid) |
Sketches
A) Plan of guide bank:
U/S D/S
bridge / weir axis
Shank (straight) |
________________________________ | ___
/ 1.0-1.5 W upstream \ | / \ tail
\________________________________/=|=\___/ 0.25 W
curved head |
R, sweep 120 deg <-- waterway W -->
________________________________ | ___
/ \ | / \
\________________________________/=|=\___/
B) Section at the shank:
top width 6 m
___________ <- HFL + 1.5 m
/ \
HFL ---/-------------\--- 2:1 slopes
/ pitching t \
bed__/__ filter ______ \___
\_ launching apron _/ (launches at 2:1)
C) Section at the u/s curved head:
Section at u/s curved head (nose)
______ <- HFL + 1.5 m
/ \ top 6 m, side 3:1 (flatter)
HFL ----/---------\----
/ pitching t \
bed ___/_____________\__
\_ apron: 2.0R scour, 1.5D' wide _/
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Launching apron, 6000 m3/s, HFL 330 m · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bund: length, curved head, apron; 4500 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Gabion guide bund and apron, 3000 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Launching apron, 5000 m3/s, HFL 225 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
All Irrigation and Drainage Engineering chapter 6 questions →