- 2076 Bhadra · 6 marks
Launching apron, 6000 m3/s, HFL 330 m
Short answer
Lacey silt factor f=1.76, normal scour R=7.07m. For straight portion, scour below bed D'=6.61m. Launching apron horizontal length 1.5D'=9.92m. Launched thickness 1.5t=1.64m (t=1.09m), laid thickness √5 t=2.44m.
Determine the length and thickness of launching apron for the straight portion of a guide bund in a river for the following data given below. Max. discharge = 6000 m³/s, Average dia. of bed material = 1.0 mm, Highest flood level (HFL) = 330 m and River bed level = 326 m.
Data and design basis
- Silt factor (Lacey):
- Flood depth above bed: m
- Design discharge for scour/apron: m³/s
1. Pitching thickness
2. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Shank (straight) | 1.5R | 10.61 m | 6.61 m | 9.92 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Answer (straight portion): length of launching apron m (horizontal), thickness m when launched (about 2.44 m as laid).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Guide bund: length, curved head, apron; 4500 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Launching apron, 5000 m3/s, HFL 225 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Launching apron, 8000 m3/s, HFL 128.5 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Launching apron, 7000 m3/s, HFL 114 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Gabion guide bund and apron, 3000 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Guide bund components and drawings, 6000 m3/s · Irrigation and Drainage Engineering, chapter 6
All Irrigation and Drainage Engineering chapter 6 questions →