Launching apron, 7000 m3/s, HFL 114 m

Short answer

f=1.76, t=1.15 m, R=7.45 m, D'=1.5R−3=8.17 m. Apron length=12.25 m, launched thickness=1.72 m (laid 2.57 m). Volume equality before and after launching on 2:1 slope used.

Design the length and thickness of launching apron for the straight portion of a guide bund in a river: Design flood = 7000 m³/s; Average diameter of river bed material = 1 mm; River bed level = 111.00; HFL = 114.00. Provide a neat sketch of designed apron.

Data and design basis

  • Silt factor (Lacey): f=1.76dmm=1.761.0=1.76f = 1.76\sqrt{d_{mm}} = 1.76\sqrt{1.0} = 1.76
  • Flood depth above bed: h=114.0−111.0=3.00h = 114.0 - 111.0 = 3.00 m
  • Design discharge for scour/apron: Q=7000Q = 7000 m³/s

1. Pitching thickness

t=0.06 Q1/3=0.06×70001/3=0.06×19.13=1.15 mt = 0.06\,Q^{1/3} = 0.06\times 7000^{1/3} = 0.06\times 19.13 = 1.15\ \text{m}

2. Scour depth and launching apron

Lacey's normal scour depth:

R=0.47(Qf)1/3=0.47(70001.76)1/3=7.45 mR = 0.47\left(\frac{Q}{f}\right)^{1/3} = 0.47\left(\frac{7000}{1.76}\right)^{1/3} = 7.45\ \text{m}

Maximum scour below HFL: 2R2R at the upstream nose, 1.5R1.5R at the shank (straight portion). The apron must launch to the slope 2H:1V2H:1V, so its horizontal width is 1.5D′1.5D' and, when launched, it covers a slope length 5 D′\sqrt5\,D' with thickness 1.5t1.5t.

PortionScour factorScour depth below HFLDepth below bed D′D'Apron length 1.5D′1.5D'
Shank (straight)1.5R11.17 m8.17 m12.25 m

Thickness: pitching t=1.15t = 1.15 m, so the launched apron thickness is 1.5t=1.5×1.15=1.721.5t = 1.5\times1.15 = 1.72 m. Equating volumes per metre, the thickness as laid over 1.5D′1.5D' width is T=1.5t×5D′1.5D′=5 t=2.57T = \dfrac{1.5t\times\sqrt5 D'}{1.5D'} = \sqrt5\,t = 2.57 m (about 2.25t2.25t).

Answer (straight portion): length of launching apron =1.5D′=12.25=1.5D' = 12.25 m, thickness =1.5t=1.72=1.5t = 1.72 m launched (about 2.57 m as laid).

        pitching
   ____/\__ 
  /\ apron laid: width 1.5D', T = 2.24 t
 bed ___________ river bed
   after launching: 2:1 slope, 1.5 t thick