Thickness of launching apron, 7 m shank

Short answer

With d=0.3 mm, f=0.964, R=9.52 m, D'=1.5R−5=9.27 m, t=1.20 m. Volume equality for 7 m width: T×7 = 1.5t×√5×D' → T=5.33 m. Launched thickness 1.80 m; required width 13.91 m, so 7 m apron is thick to compensate.

Calculate the thickness of a 7 m long launching apron of loosed stones for a shank portion of guide bund at a bridge site of a river having design flood of 8000 m³/s and flood depth of 5 m. Assume that average diameter of river bed material at flood time is 0.3 mm.

A launching apron of loose stone is laid at the toe of the guide bund. When scour occurs it launches down a 2H:1V slope. The laid thickness is found by equating the stone volume before and after launching.

Data

Q=8000Q = 8000 m³/s, flood depth h=5h = 5 m, d=0.3d = 0.3 mm, laid width of apron =7= 7 m (shank portion).

Step 1. Silt factor and scour depth

f=1.76dmm=1.760.3=0.964R=0.47(Qf)1/3=0.47(80000.964)1/3=9.52 m\begin{aligned} f &= 1.76\sqrt{d_{mm}} = 1.76\sqrt{0.3} = 0.964 \\ R &= 0.47\left(\frac{Q}{f}\right)^{1/3} = 0.47\left(\frac{8000}{0.964}\right)^{1/3} = 9.52\ \text{m} \end{aligned}

Maximum scour at the shank: 1.5R=14.271.5R = 14.27 m below HFL. Scour below the bed: D′=1.5R−h=14.27−5=9.27D' = 1.5R - h = 14.27 - 5 = 9.27 m.

Step 2. Pitching and launched thickness

t=0.06 Q1/3=0.06×20.00=1.20 m,1.5t=1.80 mt = 0.06\,Q^{1/3} = 0.06\times20.00 = 1.20\ \text{m}, \qquad 1.5t = 1.80\ \text{m}

Step 3. Thickness of the 7 m apron before launching

Slope length of launched apron =5 D′=2.236×9.27=20.74= \sqrt5\,D' = 2.236\times9.27 = 20.74 m.

T×7=1.5t×5D′=1.80×20.74T=5.33 m\begin{aligned} T\times7 &= 1.5t\times\sqrt5 D' = 1.80\times20.74 \\ T &= 5.33\ \text{m} \end{aligned}

Answer: thickness of the 7 m wide apron as laid T=5.33T = 5.33 m (it launches to 1.80 m thick on the 2:1 slope). A 7 m apron is short against a required width of 1.5D′=13.911.5D' = 13.91 m, so a thick apron is needed; it may be better to widen it to 13.913.9 m, when T=2.68T = 2.68 m.

  pitching
  ___\__ T = 5.33 m
 bed __|<-- 7 m -->|___ river bed
   after launch: 2H:1V, 1.80 m thick, D' = 9.27 m