- Asked 2/34
- 2072 Asoj · 5 marks
Guide bund: length, curved head, apron; 4500 m3/s
Short answer
Lacey waterway W=319m. Upstream shank 399m, downstream tail 80m, curved head radius 160m (120°). Pitching thickness 0.99m. Normal scour R=9.43m. Apron at shank: length 15.22m, launched thickness 1.49m (laid 2.21m). At nose: length 22.30m, same thickness.
Design the length, radius of curved head, length and thickness of launching apron of a guide bund to train a river with the following data. Design Flood Discharge: 4500 cumecs; Bed Level of river: 150.00 m; HFL: 154.00 m; Av. dia. of river bed material: 0.1 mm.
Data and design basis
- Silt factor (Lacey):
- Flood depth above bed: m
- Design discharge for scour/apron: m³/s
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 18.87 m | 14.87 m | 22.30 m |
| Shank (straight) | 1.5R | 14.15 m | 10.15 m | 15.22 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Lacey waterway | 318.64 m (adopt 319 m) |
| Length of guide bund (u/s) | 399 m; d/s tail 80 m |
| Pitching thickness | 0.99 m |
| Apron at shank: width / thickness | 15.22 m / 1.49 m launched (2.21 m laid) |
| Apron at nose: width / thickness | 22.30 m / 1.49 m launched (2.21 m laid) |
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Gabion guide bund and apron, 3000 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Launching apron, 5000 m3/s, HFL 225 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Launching apron, 7000 m3/s, HFL 114 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Launching apron, 6000 m3/s, HFL 330 m · Irrigation and Drainage Engineering, chapter 6
- Launching apron, 8000 m3/s, HFL 128.5 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund components and drawings, 6000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
All Irrigation and Drainage Engineering chapter 6 questions →