- Asked 2/34
- 2071 Magh · 8 marks
Gabion guide bund and apron, 3000 m3/s
Short answer
Lacey waterway W=260m. Upstream length 325m, downstream 65m, curved head radius 130m (120°). Gabion pitching 1.0m thick. Normal scour R=8.24m. Apron at shank: length 11.04m, launched thickness 1.30m (laid 1.93m). At nose: length 17.22m, same thickness. Gabion apron uses 2.0m (two 1m layers).
Design the length, radius of curved head, length and thickness of gabion slope pitching and gabion launching apron of a guide bund to train a river with the following data. Design Flood Discharge: 3000 cumecs; River Bed Level: 240.0 m; HFL: 245.0 m; Average dia. of river bed material: 0.1 mm.
Data and design basis
- Silt factor (Lacey):
- Flood depth above bed: m
- Design discharge for scour/apron: m³/s
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Gabion slope protection: use gabion boxes (1.0 m thick) in one layer, so adopt m (next standard size above 0.87 m) over a 0.15 m gravel filter.
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 16.48 m | 11.48 m | 17.22 m |
| Shank (straight) | 1.5R | 12.36 m | 7.36 m | 11.04 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Lacey waterway | 260.17 m (adopt 260 m) |
| Length of guide bund (u/s) | 325 m; d/s tail 65 m |
| Pitching thickness | 0.87 m |
| Apron at shank: width / thickness | 11.04 m / 1.30 m launched (1.93 m laid) |
| Apron at nose: width / thickness | 17.22 m / 1.30 m launched (1.93 m laid) |
Gabion details
- Slope pitching: gabion boxes m laid in one layer (1.0 m thick) on a 0.15 m geotextile or gravel filter, wire mesh 8x10 cm, galvanised and PVC coated.
- Launching apron: launched thickness m; laid thickness m, so adopt 2.0 m (two layers of 1 m gabion boxes or four layers of 0.5 m mattress) over a width = 11.04 m (shank) and 17.22 m (nose).
- Gabion boxes are flexible, so they follow the scour hole and launch without breaking.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Guide bund: length, curved head, apron; 4500 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bank and launching apron, 5000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund components and drawings, 6000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund and apron, 13,100 m3/s · Irrigation and Drainage Engineering, chapter 6
- Launching apron, 6000 m3/s, HFL 330 m · Irrigation and Drainage Engineering, chapter 6
All Irrigation and Drainage Engineering chapter 6 questions →