- 2078 Baisakh · 8 marks
Guide bund and apron, 13,100 m3/s
Short answer
Total waterway 659 m; upstream guide bund 824 m, downstream tail 165 m. Pitching thickness 1.41 m. Apron design uses 1.2×Q=15720 m³/s. Lacey's normal scour depth R=11.92 m. At nose, apron width 20.71 m; at shank, 11.77 m; launched thickness 2.12 m, laid thickness 3.16 m.
Design guide bunds and launching apron required to be provided for a bridge across a river whose total waterway is 658.88 m. The design flood discharge is 13,100 m³/s which may be increased by 20% for the design of the launching apron. The mean size of the river bed material is 0.3 mm.
Data and design basis
- Total waterway m (given). The flood depth is not given, so Lacey's regime depth for the intensity m²/s is used: m. .
- Discharge is increased by 20 % for the apron design: m³/s.
- Silt factor (computed, not given):
- Flood depth (assumed Lacey regime depth): m
- Design discharge for scour/apron: m³/s; for pitching, m³/s
1. Waterway and length of guide bund
Waterway between abutments m (given). Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 23.84 m | 13.81 m | 20.71 m |
| Shank (straight) | 1.5R | 17.88 m | 7.85 m | 11.77 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Waterway (given) | 658.88 m (adopt 659 m) |
| Length of guide bund (u/s) | 824 m; d/s tail 165 m |
| Pitching thickness | 1.41 m |
| Apron at shank: width / thickness | 11.77 m / 2.12 m launched (3.16 m laid) |
| Apron at nose: width / thickness | 20.71 m / 2.12 m launched (3.16 m laid) |
Sketches
Plan of guide bunds:
U/S D/S
bridge / weir axis
Shank (straight) |
________________________________ | ___
/ 1.0-1.5 W upstream \ | / \ tail
\________________________________/=|=\___/ 0.25 W
curved head |
R, sweep 120 deg <-- waterway W -->
________________________________ | ___
/ \ | / \
\________________________________/=|=\___/
Section at the shank (straight portion):
top width 6 m
___________ <- HFL + 1.5 m
/ \
HFL ---/-------------\--- 2:1 slopes
/ pitching t \
bed__/__ filter ______ \___
\_ launching apron _/ (launches at 2:1)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Bell's waterway and guide bund, 7500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bank and launching apron, 5000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund: length, curved head, apron; 4500 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Gabion guide bund and apron, 3000 m3/s · Irrigation and Drainage Engineering, chapter 6 · asked 2×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4
- Construct 3-h UH and flood hydrograph, 524.88 ha · Engineering Hydrology, chapter 5
All Irrigation and Drainage Engineering chapter 6 questions →