Guide bund and apron, 13,100 m3/s

Short answer

Total waterway 659 m; upstream guide bund 824 m, downstream tail 165 m. Pitching thickness 1.41 m. Apron design uses 1.2×Q=15720 m³/s. Lacey's normal scour depth R=11.92 m. At nose, apron width 20.71 m; at shank, 11.77 m; launched thickness 2.12 m, laid thickness 3.16 m.

Design guide bunds and launching apron required to be provided for a bridge across a river whose total waterway is 658.88 m. The design flood discharge is 13,100 m³/s which may be increased by 20% for the design of the launching apron. The mean size of the river bed material is 0.3 mm.

Data and design basis

  • Total waterway W=658.88W = 658.88 m (given). The flood depth is not given, so Lacey's regime depth for the intensity q=Q/W=13100/658.88=19.88q = Q/W = 13100/658.88 = 19.88 m²/s is used: RL=1.35(q2/f)1/3=10.03R_L = 1.35(q^2/f)^{1/3} = 10.03 m. f=1.760.3=0.964f = 1.76\sqrt{0.3} = 0.964.
  • Discharge is increased by 20 % for the apron design: Qa=1.2×13100=15720Q_a = 1.2\times13100 = 15720 m³/s.
  • Silt factor (computed, not given): f≈0.96f \approx 0.96
  • Flood depth (assumed Lacey regime depth): h=10.03h = 10.03 m
  • Design discharge for scour/apron: Q=15720Q = 15720 m³/s; for pitching, Q=13100Q = 13100 m³/s

1. Waterway and length of guide bund

Waterway between abutments W=658.88W = 658.88 m (given). Length of guide bund (Garg): upstream shank =1.0=1.0 to 1.5 W1.5\,W, downstream tail =0.2=0.2 to 0.5 W0.5\,W. Adopt

Lus=1.25W=1.25×659=824 mLds=0.25W=165 m\begin{aligned} L_{us} &= 1.25W = 1.25\times 659 = 824\ \text{m} \\ L_{ds} &= 0.25W = 165\ \text{m} \end{aligned}

Curved heads: upstream radius Ru≈0.5W=330R_u \approx 0.5W = 330 m with sweep 120∘120^\circ to 145∘145^\circ (adopt 120∘120^\circ); downstream radius Rd≈0.25W=165R_d \approx 0.25W = 165 m with sweep about 45∘45^\circ. Arc length of upstream head =Ruθ=330×2.094=690= R_u\theta = 330\times 2.094 = 690 m, so total length on the upstream side ≈1514\approx 1514 m.

2. Thickness of stone pitching

t=0.06 Q1/3=0.06×131001/3=0.06×23.57=1.41 mt = 0.06\,Q^{1/3} = 0.06\times 13100^{1/3} = 0.06\times 23.57 = 1.41\ \text{m}

Adopt t≈1.5t \approx 1.5 m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).

3. Scour depth and launching apron

Lacey's normal scour depth:

R=0.47(Qf)1/3=0.47(157200.96)1/3=11.92 mR = 0.47\left(\frac{Q}{f}\right)^{1/3} = 0.47\left(\frac{15720}{0.96}\right)^{1/3} = 11.92\ \text{m}

Maximum scour below HFL: 2R2R at the upstream nose, 1.5R1.5R at the shank (straight portion). The apron must launch to the slope 2H:1V2H:1V, so its horizontal width is 1.5D′1.5D' and, when launched, it covers a slope length 5 D′\sqrt5\,D' with thickness 1.5t1.5t.

PortionScour factorScour depth below HFLDepth below bed D′D'Apron length 1.5D′1.5D'
Nose (u/s curved head)2.0R23.84 m13.81 m20.71 m
Shank (straight)1.5R17.88 m7.85 m11.77 m

Thickness: pitching t=1.41t = 1.41 m, so the launched apron thickness is 1.5t=1.5×1.41=2.121.5t = 1.5\times1.41 = 2.12 m. Equating volumes per metre, the thickness as laid over 1.5D′1.5D' width is T=1.5t×5D′1.5D′=5 t=3.16T = \dfrac{1.5t\times\sqrt5 D'}{1.5D'} = \sqrt5\,t = 3.16 m (about 2.25t2.25t).

Summary

ItemValue
Waterway WW (given)658.88 m (adopt 659 m)
Length of guide bund (u/s)824 m; d/s tail 165 m
Pitching thickness tt1.41 m
Apron at shank: width 1.5D′1.5D' / thickness11.77 m / 2.12 m launched (3.16 m laid)
Apron at nose: width / thickness20.71 m / 2.12 m launched (3.16 m laid)

Sketches

Plan of guide bunds:

 U/S                                          D/S
                       bridge / weir axis
   Shank (straight)                |
 ________________________________  |  ___
/  1.0-1.5 W upstream            \ | /   \  tail
\________________________________/=|=\___/  0.25 W
 curved head                       |
 R, sweep 120 deg    <-- waterway W -->
 ________________________________  |  ___
/                                \ | /   \
\________________________________/=|=\___/

Section at the shank (straight portion):

           top width 6 m
         ___________  <- HFL + 1.5 m
        /           \
 HFL ---/-------------\---  2:1 slopes
       / pitching t    \
 bed__/__ filter ______ \___
      \_ launching apron _/ (launches at 2:1)