Design steps of a guide bund
Short answer
Steps: determine Q, silt factor f = 1.76√d; waterway W = 4.75√Q; upstream shank 1–1.5W, downstream 0.2–0.5W; curved heads; top level HFL + 1.5 m, top width 6 m; pitching thickness t = 0.06Q^(1/3); scour depth R = 0.47(Q/f)^(1/3), max 2R at nose; apron width 1.5D' (D' = scour – flood depth), thickness 1.5t launched.
Write down the design steps of the guide bund (guide bank) with a suitable sketch / example.
The design of a guide bund (guide bank) follows Lacey's regime theory and Garg's recommendations. The steps are listed first and then worked for an example.
Design steps
- Find the design discharge , HFL, bed level, bed material size .
- Silt factor .
- Waterway .
- Length: upstream shank to , downstream to .
- Curved heads: radius and sweep angle.
- Top level HFL m (free-board); top width 6 m; side slopes 2:1.
- Pitching thickness .
- Scour depth ; maximum scour (nose), (shank) below HFL.
- Apron: scour flood depth; width ; thickness (launched).
- Draw plan and sections.
Example
m³/s, bed material mm, HFL m, bed m, so the flood depth is m and the silt factor is .
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 13.31 m | 9.31 m | 13.97 m |
| Shank (straight) | 1.5R | 9.98 m | 5.98 m | 8.98 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Result: m, length of upstream bund m, m, shank apron width m and nose apron width m, launched thickness m.
Plan: ________ shank ________ bridge
( curved head |=|
\____________________ |=|
Section: top 6 m, HFL+1.5, slope 2:1, pitching t, apron
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Bell's guide bund plan, sections, design steps · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 7000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bank design, 4000 m3/s, d 0.40 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bank design, 6500 m3/s · Irrigation and Drainage Engineering, chapter 6
- IC manufacturing steps; top-down F = xz + y · Embedded System, chapter 8
- Redundant hierarchical network design for bank · Internet and Intranet, chapter 5
- Design steps of surface drainage · Transportation Engineering I, chapter 4 · asked 3×
- Column slab base: sketch and design steps · Design of Steel and Timber Structure, chapter 6 · asked 3×
All Irrigation and Drainage Engineering chapter 6 questions →