- 2078 Poush · 5 marks
Guide bank design, 4000 m3/s, d 0.40 mm
Short answer
Lacey waterway 300 m; upstream guide bund 375 m, downstream tail 75 m. Pitching thickness 0.95 m. Normal scour depth R=7.20 m. Nose apron width 17.10 m, shank apron 11.70 m; launched thickness 1.43 m, laid thickness 2.13 m.
Design a guide bank required for a bridge on a river having following particulars: maximum flood discharge = 4000 m³/s, HFL = 205 m, river bed level = 202 m, average diameter of river bed material = 0.40 mm.
Data and design basis
- Silt factor (Lacey):
- Flood depth above bed: m
- Design discharge for scour/apron: m³/s
1. Waterway and length of guide bund
Lacey's regime waterway: m. Adopt m. Length of guide bund (Garg): upstream shank to , downstream tail to . Adopt
Curved heads: upstream radius m with sweep to (adopt ); downstream radius m with sweep about . Arc length of upstream head m, so total length on the upstream side m.
2. Thickness of stone pitching
Adopt m (pitching on the river side slope 2:1, over a 0.15 to 0.3 m graded filter).
3. Scour depth and launching apron
Lacey's normal scour depth:
Maximum scour below HFL: at the upstream nose, at the shank (straight portion). The apron must launch to the slope , so its horizontal width is and, when launched, it covers a slope length with thickness .
| Portion | Scour factor | Scour depth below HFL | Depth below bed | Apron length |
|---|---|---|---|---|
| Nose (u/s curved head) | 2.0R | 14.40 m | 11.40 m | 17.10 m |
| Shank (straight) | 1.5R | 10.80 m | 7.80 m | 11.70 m |
Thickness: pitching m, so the launched apron thickness is m. Equating volumes per metre, the thickness as laid over width is m (about ).
Summary
| Item | Value |
|---|---|
| Lacey waterway | 300.42 m (adopt 300 m) |
| Length of guide bund (u/s) | 375 m; d/s tail 75 m |
| Pitching thickness | 0.95 m |
| Apron at shank: width / thickness | 11.70 m / 1.43 m launched (2.13 m laid) |
| Apron at nose: width / thickness | 17.10 m / 1.43 m launched (2.13 m laid) |
Sketches
Plan of guide bunds:
U/S D/S
bridge / weir axis
Shank (straight) |
________________________________ | ___
/ 1.0-1.5 W upstream \ | / \ tail
\________________________________/=|=\___/ 0.25 W
curved head |
R, sweep 120 deg <-- waterway W -->
________________________________ | ___
/ \ | / \
\________________________________/=|=\___/
Section at the shank (straight portion):
top width 6 m
___________ <- HFL + 1.5 m
/ \
HFL ---/-------------\--- 2:1 slopes
/ pitching t \
bed__/__ filter ______ \___
\_ launching apron _/ (launches at 2:1)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Guide bund design, 4000 m3/s, d 0.1 mm · Irrigation and Drainage Engineering, chapter 6
- Guide bank and launching apron, 5000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bank design, 6500 m3/s · Irrigation and Drainage Engineering, chapter 6
- Guide bund design, 4000 m3/s, f 1.1 · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Vertical drop design, Q 1.8 m3/s (bed 205.05) · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Launching apron, 7000 m3/s, HFL 114 m · Irrigation and Drainage Engineering, chapter 6 · asked 3×
- Bridge components sketch; river bank protection · Transportation Engineering II, chapter 5
- Bridge site factors; river bank protection structures · Transportation Engineering II, chapter 5
- Gumbel design flood, 40-year life, 85% reliability · Engineering Hydrology, chapter 6 · asked 2×
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4
All Irrigation and Drainage Engineering chapter 6 questions →