Skip to main content

Septic tank and soak pit, household of 80

Short answer

Septic tank internal dimensions 4.9 m × 1.8 m × 2.3 m (including 0.3 m freeboard) with two chambers. Total liquid volume 17.53 m³. Soak pits: 5 circular pits of 3 m diameter and 3 m effective depth, providing 120 m² infiltration area at 80 L/m²/d rate.

Design a septic tank and soak pit to dispose the sewage generated from a household of 80 persons. The sewage is generated at the rate of 120 lit/person/day. Assume that septic tank is cleaned once in 2 years and infiltration rate of soil is 80 lit/m²/day.

Given: 80 persons, 120 L/c/d, desludging every 2 years, infiltration 80 L/m²/d. Assume 24 h detention and soak pit effective depth 3 m (ground-water table deep).

Septic tank

  • Sewage flow: Q=80×120 L/c/d=9600 L/d=9.600 m3/dQ = 80 \times 120\ \text{L/c/d} = 9600\ \text{L/d} = 9.600\ \text{m}^3\text{/d}
  • Sewage (settling) zone for 24 h detention: V1=9.600 m3V_1 = 9.600\ \text{m}^3
  • Sludge digestion zone: 0.0425×80=3.400 m30.0425 \times 80 = 3.400\ \text{m}^3
  • Digested sludge storage for 2 years: (0.085/3)×2×80=4.533 m3(0.085/3) \times 2 \times 80 = 4.533\ \text{m}^3
V=9.600+3.400+4.533=17.53 m3V = 9.600 + 3.400 + 4.533 = 17.53\ \text{m}^3

Adopt liquid depth d=2.0d = 2.0 m and L:B≈3:1L:B \approx 3:1.

Plan area=17.53/2.0=8.77 m2B=8.77/3≈1.8 m,L=8.77/1.8≈4.9 m\begin{aligned} \text{Plan area} &= 17.53/2.0 = 8.77\ \text{m}^2 \\ B &= \sqrt{8.77/3} \approx 1.8\ \text{m}, \quad L = 8.77/1.8 \approx 4.9\ \text{m} \end{aligned}

Check: 4.9×1.8×2.0=17.64 m3≥17.53 m34.9 \times 1.8 \times 2.0 = 17.64\ \text{m}^3 \ge 17.53\ \text{m}^3 (safe).

Septic tank: internal size 4.9 m×1.8 m×2.3 m4.9\ \text{m} \times 1.8\ \text{m} \times 2.3\ \text{m} (including 0.3 m free board), in two chambers: first chamber 3.303.30 m long (2/3), second 1.601.60 m (1/3), separated by a partition wall with an opening near mid-depth. Inlet and outlet through T-pipes dipping 0.3 m below water level.

Soak pit

  • Required infiltration area: A=Q/rate=9600/80=120.00 m2A = Q/\text{rate} = 9600/80 = 120.00\ \text{m}^2 (only the side wall below the inlet is counted; the bottom is ignored as it clogs)
  • Adopt effective depth h=3h = 3 m

A single pit would be too large, so adopt pits of D=3.0D = 3.0 m (area of each = π×3.0×3=28.27 m2\pi \times 3.0 \times 3 = 28.27\ \text{m}^2).

N=120.0028.27=4.24⇒5 pitsN = \frac{120.00}{28.27} = 4.24 \Rightarrow 5\ \text{pits}

Soak pits: 5 circular pits, each 3.0 m diameter and 3 m deep, honeycomb-lined and filled with brick bats/gravel, spaced at least 3 m (about 2 times the diameter) apart and connected through a distribution box. Soak-pit bottoms must stay at least 1 m above the highest ground-water level.

✓ Answer checked by Claude Opus 5.5 (high effort)