Septic tank: flow 1650 L/d, total volume = 1.650+0.638+1.275 = 3.56 m³, tank 2.7×0.9×1.5 m. Soak pit: required side wall area 1650/100 = 16.5 m²; effective depth 3 m, diameter = 16.5/(π×3) ≈ 1.8 m, lined with open-jointed masonry, bottom 1.5 m above groundwater.

Design a septic tank and soak pit for 15 users of a house at a place where infiltration capacity of soil is 100 liters per square meter per day. The peak sewage flow rate 110 lpcd and the detention time in septic tank is 1 day and sludge is cleaned at an interval of 3 years. The ground water table lies 10 m below the ground level.

Given: 15 users, 110 L/c/d, detention 1 day, desludging every 3 years, infiltration 100 L/m²/d, ground-water 10 m below ground (so a deep pit is safe).

Septic tank

  • Sewage flow: Q=15×110 L/c/d=1650 L/d=1.650 m3/dQ = 15 \times 110\ \text{L/c/d} = 1650\ \text{L/d} = 1.650\ \text{m}^3\text{/d}
  • Sewage (settling) zone for 24 h detention: V1=1.650 m3V_1 = 1.650\ \text{m}^3
  • Sludge digestion zone: 0.0425×15=0.638 m30.0425 \times 15 = 0.638\ \text{m}^3
  • Digested sludge storage for 3 years: (0.085/3)×3×15=1.275 m3(0.085/3) \times 3 \times 15 = 1.275\ \text{m}^3
V=1.650+0.638+1.275=3.56 m3V = 1.650 + 0.638 + 1.275 = 3.56\ \text{m}^3

Adopt liquid depth d=1.5d = 1.5 m and L:B≈3:1L:B \approx 3:1.

Plan area=3.56/1.5=2.38 m2B=2.38/3≈0.9 m,L=2.38/0.9≈2.7 m\begin{aligned} \text{Plan area} &= 3.56/1.5 = 2.38\ \text{m}^2 \\ B &= \sqrt{2.38/3} \approx 0.9\ \text{m}, \quad L = 2.38/0.9 \approx 2.7\ \text{m} \end{aligned}

Check: 2.7×0.9×1.5=3.65 m3≥3.56 m32.7 \times 0.9 \times 1.5 = 3.65\ \text{m}^3 \ge 3.56\ \text{m}^3 (safe).

Septic tank: internal size 2.7 m×0.9 m×1.8 m2.7\ \text{m} \times 0.9\ \text{m} \times 1.8\ \text{m} (including 0.3 m free board), in two chambers: first chamber 1.801.80 m long (2/3), second 0.900.90 m (1/3), separated by a partition wall with an opening near mid-depth. Inlet and outlet through T-pipes dipping 0.3 m below water level.

Soak pit

  • Required infiltration area: A=Q/rate=1650/100=16.50 m2A = Q/\text{rate} = 1650/100 = 16.50\ \text{m}^2 (only the side wall below the inlet is counted; the bottom is ignored as it clogs)
  • Adopt effective depth h=3h = 3 m
πDh=16.50⇒D=16.50π×3=1.75≈1.8 m\pi D h = 16.50 \Rightarrow D = \frac{16.50}{\pi \times 3} = 1.75 \approx 1.8\ \text{m}

Check: π×1.8×3=16.96 m2≥16.50 m2\pi \times 1.8 \times 3 = 16.96\ \text{m}^2 \ge 16.50\ \text{m}^2.

Soak pit: one circular pit, 1.8 m internal diameter and 3 m deep, lined with dry brick/stone masonry with open joints (honeycomb), filled with brick bats/gravel, and covered with a slab.

The ground-water table is 10 m deep, far below the pit bottom (3 m), so the 1 m clearance is satisfied.