Skip to main content

Septic tank and soak pit design in Nepal

Short answer

Septic tank zones: scum, settling, digestion, storage. Design based on 24 h detention, per capita sludge volumes (0.0425 m³ digestion, 0.085 m³ storage for 3 yr), two chambers, T-pipes, watertight structure, min 6 m from water sources. Soak pit area from percolation test, circular pit, 15 m from well.

What are the design considerations adopted for the design of septic tank and soak pit in Nepal (state the procedure for designing). Briefly describe them in neat sketch showing the zones and their purposes.

A septic tank is a watertight, single-storey sedimentation and digestion tank that gives primary treatment to the sewage of an isolated building. Its effluent is still polluted, so it is disposed of in a soak pit (or dispersion trench) where the soil gives further treatment.

Zones of a septic tank and their purposes

 Inlet                       Outlet
  |   (T-pipe)  | partition   |(T-pipe)
  v             |  wall       v
 ___|____________|_____________|___  <- cover slabs
 |  ^ scum   |  ^ opening  | scum  |  
 |-----------|-------------|-------|  <- water level
 |  Sewage zone (settling)  | zone  |
 |..........................|.......|
 |  Sludge digestion zone   |       |
 |  Digested sludge storage |       |
 |___________________________|______|
   Chamber 1 (2/3 L)      Chamber 2 (1/3 L)
  • Scum zone (top): grease, oil and light solids float here; the dipped T-pipes keep scum from leaving.
  • Sewage (settling) zone: sewage is held about 24 h so that suspended solids settle; designed for the daily flow.
  • Sludge digestion zone: settled solids are digested anaerobically by bacteria, producing gas and reducing volume.
  • Digested sludge storage zone: stabilised sludge collects between desludging periods (usually 2-3 years).

Design considerations (Nepal practice)

  1. Flow: sewage = 80% of water supply (or 80-100 L per person per day); users from the building occupancy.
  2. Detention time: 24 h (minimum 12-24 h) for the sewage zone.
  3. Sludge: digestion zone 0.0425 m³/person; digested sludge storage about 0.0283 m³/person/year (0.085 m³/person for 3 years).
  4. Shape and size: liquid depth 1.0-2.0 m, plus 0.3 m free board; width at least 0.75 m; length at least 1.5 m; L:BL:B = 2:1 to 4:1; usually 2 chambers, first = 2/3 length.
  5. Inlet/outlet: T-pipes dipping 0.3 m (up to 0.45 m) below the water level, with vent pipe and manhole cover for inspection and desludging.
  6. Structure: watertight masonry or RCC, 1:3 cement plaster, 75 mm thick floor sloping towards inlet; keep at least 6 m from water sources and 1.5 m from buildings.
  7. Effluent disposal: soak pit, dispersion trench or evapotranspiration mound, depending on soil.

Procedure for design

  1. Find the number of users and sewage flow QQ.
  2. Volume of sewage zone =Q×= Q \times detention time.
  3. Add digestion and sludge storage volumes (per-person rates ×\times users).
  4. Fix depth, then L×B=V/dL \times B = V/d with L:BL:B = 3:1; add free board.
  5. Divide into two chambers; fix T-pipe, vent and manhole.

Soak pit design

  • Area A=Q/infiltration rateA = Q/\text{infiltration rate} (L/m²/d, from percolation test).
  • Circular pit of diameter DD and effective depth hh: πDh=A\pi D h = A, usually DD = 1.5-3 m, hh = 2-3 m.
  • Pit is honeycomb-lined and filled with brick bats/gravel; bottom at least 1 m above ground-water; at least 15 m from a well. For larger areas use several pits or dispersion trenches.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Sanitary Engineering chapter 9 questions →