- 2074 Bhadra · 4 marks
Skimming tank: purpose and construction
Short answer
Purpose is to prevent oil and grease from forming scum, clogging filters and disturbing biological treatment. Construction: rectangular tank about 1.5 m deep, 3 min detention, diffusers supply 0.3 m³ air/m³ sewage; submerged baffle holds scum, sewage exits below; scum skimmed by trough or mechanical skimmer.
With neat sketches, describe the purpose and construction of a skimming tank.
A skimming tank removes floating grease, oil, fat and soap scum from sewage before it reaches the sedimentation tank.
Purpose
- To stop oil and grease forming scum in sedimentation tanks, which causes odour, clogs trickling-filter media and disturbs sludge digestion and aeration.
- Needed mostly for sewage from hotels, restaurants, slaughterhouses, dairies and workshops.
Construction
Section Plan
air -> ~~~~~~~~~~ water level +----------------+
inlet -> | o o o scum/ baffle | inlet -> | |
-> | air rises grease -> trough diffusers | outlet
|__diffusers____|__ outlet below baffle --> |
- A rectangular tank about 1.5 m deep with a detention time of about 3 minutes.
- Diffusers along one side supply air (about 0.3 m³ per m³ of sewage). The rising bubbles lift grease and oil to the surface and give a spiral flow.
- A submerged baffle (scum board) keeps floating matter back, and the sewage is drawn off below it.
- Scum is collected in a trough at the surface and is removed by hand or a mechanical skimmer, then dried, buried or burnt.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Skimming tank; degree of treatment factors · Sanitary Engineering, chapter 7
- Skimming tank; grit vs sedimentation tank · Sanitary Engineering, chapter 7
- Grit chamber: purpose, construction, design · Sanitary Engineering, chapter 7 · asked 4×
- Pit privy: purpose and construction · Sanitary Engineering, chapter 9
- Septic tank and soak pits, 15 users, Terai · Sanitary Engineering, chapter 9
- Drop manhole: need and construction · Sanitary Engineering, chapter 4 · asked 4×
- Service reservoirs: purpose and construction · Water Supply Engineering, chapter 7 · asked 2×
- Break pressure tank: need and construction · Water Supply Engineering, chapter 9 · asked 9×
- Excavation equipment and sketches · Construction Management, chapter 4 · asked 6×
- Earth compaction equipment with sketches · Construction Management, chapter 4 · asked 3×