- 2074 Bhadra · 8 marks
Sludge volume from PST and SST
Short answer
PST removes 3360 kg/d dry solids, giving 66.5 m³/d sludge at 95% moisture. Trickling filter removes 2618 kg/d BOD, producing 1047 kg/d dry humus solids, giving 20.7 m³/d SST sludge (also 95% moisture).
The biological process occurs in trickling filter. PST removes 60% suspended solids and 30% of BOD. Determine the volume of sludge produced by PST as well as SST with the following data. Sp. gr. of inorganic solids = 2.65, Sp. gr. of organic solid = 1.02; Flow of sewage = 20*10⁶ l/d; BOD5 of sewage = 220 mg/l; Suspended solids in the sewage = 280 mg/l; Water content of the sludge = 95%.
Sludge volume , where is the dry solids mass, the specific gravity of wet sludge and the water fraction.
Assumptions (not given in the data): suspended solids are 70% organic and 30% inorganic; trickling filter removes 85% of the BOD reaching it; humus (SST sludge) produced is 0.4 kg dry solids per kg BOD removed; SST sludge also has 95% water.
Specific gravity of sludge
Sludge from PST
- Suspended solids in raw sewage: kg/d
- Removed in PST (60%): kg/d
Sludge from SST (humus)
- BOD in raw sewage: kg/d
- BOD after PST (30% removed): kg/d
- BOD removed in trickling filter (85%): kg/d
- Dry humus solids: kg/d
Answer: PST sludge /d; SST sludge /d (total about 87.3 m³/d).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Sludge volume and digester, 4 MLD · Sanitary Engineering, chapter 8
- Sludge volume from sedimentation tank, 10 MLD · Sanitary Engineering, chapter 8
- HR trickling filter, BOD 280 mg/l · Sanitary Engineering, chapter 7
- Effluent BOD of two-stage trickling filter · Sanitary Engineering, chapter 7
- Yearly sludge volume, 6 MLD · Sanitary Engineering, chapter 8
- Standard rate trickling filter, 4 MLD, NRC · Sanitary Engineering, chapter 7
- Box plot; third quartile of suspended solids · Probability and Statistics, chapter 1
- Organic/inorganic water pollutants, effects, remedies · Engineering Chemistry, chapter 3 · asked 2×
- Solid and suspended ground floor · Building Technology, chapter 7 · asked 2×
- Process to determine wire size · Basic Electrical and Electronics Engineering, chapter 4