Formed drain, trap drain; grout hole criteria

Short answer

Vertical formed drains (15-30 cm dia., 3 m spacing) lead seepage to a trap drain in the gallery. Drainage holes (75-100 mm, 20-30% head depth) relieve uplift. Grout holes: 38-76 mm dia., depth 30-50% of head, staged pattern (initial 6-12 m spacing, final 1.5-3 m), inclined 10-15° upstream.

Drawing a section of a concrete gravity dam, show the arrangements of vertical formed drain, trap drain and drainage hole. What are the general criteria for size, depth and pattern of grout holes for certain grouting in gravity dam foundation?

Arrangement of drains in a gravity dam section

   Upstream                       Downstream
   face  |<-- 3-5 m -->|
     |   |  Vertical   |  gallery
 Water-> |  formed     |  [===]  <- trap drain in
     |   |  drain (VFD)|    |        the gallery floor
     |   |   |   |     |    |
 Dam |   |   |   |     |    |
     |   |   |   |     |    v
 ----+---+---+---+-----+---[  ]---------- foundation
         grout   grout       drainage
         holes   curtain     holes (downstream of curtain)
  • Vertical formed drain: 15-30 cm diameter porous or formed drains in the dam body, 3 m apart, 3-5 m from the u/s face, extending from the crest/gallery down to the foundation gallery; they collect the seepage through the concrete.
  • Trap drain: the longitudinal channel in the floor of the gallery, that receives water from the vertical drains and the drainage holes, and leads it to the sump or the d/s.
  • Drainage holes: 75-100 mm diameter holes drilled downstream of the grout curtain from the gallery into the foundation, about 3 m apart, 20-30% of the head (or 0.2 × H) in depth, to relieve the uplift.

General criteria for grout holes (curtain grouting)

  • Size: Holes of 38-76 mm (EX/AX/NX) diameter, typically 50 mm, drilled by rotary or percussion drills.
  • Depth: The depth of the main curtain is about 30-50% of the water head (commonly 13H\tfrac13H to 12H\tfrac12H), or deeper to reach an impervious rock layer (water loss less than 1-3 Lugeon). Consolidation holes are shorter, 5-10 m.
  • Pattern: A single line of holes along the u/s face (a curtain) is common, and 2-3 lines are used in poor rock. Holes are drilled in stages: primary holes at 6-12 m spacing, then secondary and tertiary holes in between (final spacing 1.5-3 m). Holes may be inclined (10-15° upstream) to cut the vertical joints.
  • Pressure: Grout pressure is raised with depth, about 0.25 bar (25 kPa) per metre of rock cover (roughly 1 psi per foot), so that the rock is not lifted or opened up.
  • Grout mix: Start with a thin mix (water:cement 5:1) and thicken to 0.5:1 as the take reduces.
  • Check: Test with water pressure (Lugeon) tests before and after; inspection holes are drilled and cores examined.