- 2072 Chaitra · 3+5+3+5 marks
Gravity dam equilibrium and overtopping discharge coefficient
Short answer
Base width B≈12.1 m, downstream α≈66°. Heel tensile stress -79 kN/m², so not tension-free. Required cohesion 174 kN/m² for shear safety factor 2.5. Discharge coefficient C=1.01 (C_d≈0.34) is low, indicating possible head overestimation or poor crest shape.
A concrete gravity dam shown in the figure below was constructed for the development of a hydropower project. The dam has a vertical upstream face and an inclined downstream face. The highest regulated water level (HRWL) of the dam is fixed at 1 m below the top crest level. At HRWL, the storage capacity of the reservoir created by the dam is 60 million m³. The reservoir capacity curve of the dam is shown in the figure below. In a flood situation the 80 m long dam crest can serve as a spillway to discharge the flood. Assume density of concrete kN/m³ and the friction angle between the dam and foundation . a) Find all main forces acting on the dam when the water level in the reservoir is at HRWL. Give your answer in terms of base width B. b) Find the bottom width B and downstream inclined angle α if the dam is at the state of moment equilibrium with respect to the downstream dam toe. Use a factor of safety against overturning as 1.4. c) Is the dam free from tensile stress? Find the required unit shear resistance (cohesion) if the shear safety factor of the dam is . d) In a flood event the dam shown in the figure overtopped but did not fail. The outflow discharge over the dam crest was estimated to be 320 m³/s. During this time, the reservoir water level was raised to 722.5 masl. Find the discharge coefficient and give your comments on the value. [Figure: dam with crest width 3 m, vertical upstream face, base at 700 masl, downstream face inclined at angle α, base width B; capacity curve plotting elevation (695 to 740 masl) against volume (0 to 140 million m³).]
Assumptions
The figure values are not given in the question, so these are assumed: crest level 720 masl (dam height m above the base at 700 masl), so HRWL masl and the water depth m. Crest width 3 m, vertical u/s face. kN/m³, kN/m³, . Uplift is taken as triangular and full (no drainage): at the heel and zero at the toe. Forces per metre length.
3 m
+---+ 720 crest
~|~~~| 719 HRWL
| \
| \ alpha
| \
700 +----\
heel <--B--> toe
a) Main forces at HRWL (in terms of B)
Split the section into a rectangle () and a triangle (base , height 20).
- kN at from the toe
- kN at from the toe
- Water thrust kN acting at m above the base
- Uplift kN acting upward at from the toe
b) Base width B and angle α for
Moments about the toe:
Condition gives, after expanding, a quadratic in :
Solving: m (check: ).
Angle of the d/s face: , so with the horizontal (the face makes 24.4° with the vertical, slope H : 1 V).
c) Tension and required shear resistance
kN; kN. kN/m.
m from the toe, m, and m.
Since , the resultant is outside the middle third and the dam is not free from tension: kN/m² (tensile), and kN/m².
Shear safety factor :
Required unit shear resistance ≈ 174 kN/m².
d) Discharge coefficient during overtopping
Head over the crest m, crest length m, m³/s.
In the form : .
Comment: For a broad-crested or ogee crest, is about 1.7-2.2 (-). The value 1.01 is much lower, which means the estimated 320 m³/s is small for a head of 2.5 m. The reasons may be an over-estimated head, a submerged (tail water) flow, or a poor crest shape/rough overtopped surface, or the estimate of discharge is wrong. The check should be repeated with the measured crest level.
Answer: B ≈ 12.1 m, α ≈ 66°; tension occurs at the heel; required shear resistance ≈ 174 kN/m²; C ≈ 1.01 (C_d ≈ 0.34).
Related questions
- Gravity dam stability (SG 2.4, RL 0-70) · Hydropower Engineering, chapter 4
- Gravity dam concrete volume from hydrostatic thrust · Hydropower Engineering, chapter 4
- Gravity dam section: shear stress near toe (2082) · Hydropower Engineering, chapter 4
- Gravity dam stresses, principal stress, FOS (2079) · Hydropower Engineering, chapter 4
- Gravity dam stability and shear stress at toe (2081) · Hydropower Engineering, chapter 4
- Gravity dam forces and stability checks (2081 Baishakh) · Hydropower Engineering, chapter 4
- Sliding and overturning check of gravity dam · Hydro Power, chapter 4
- Stresses in gravity dam with drain holes · Hydro Power, chapter 4
- Elementary profile and 40 m gravity dam stability · Hydro Power, chapter 4
- High dam hydropower project components · Power Plant Design, chapter 3