Project selection methods
Short answer
Project selection methods evaluate proposals to choose those aligning with organisational goals. They include benefit measurement (scoring models, benefit-cost ratio), financial methods (NVP, IRR, payback), constrained optimization, and non-numeric approaches like operating necessity and sacred cow.
What are project selection methods?
Project selection is the process of evaluating proposed projects and choosing those that best meet organisational goals, since resources are limited. Methods are classified as follows.
1. Benefit measurement (comparative) methods
- Scoring models: weighted criteria (strategic fit, ROI, risk, resource availability). Each project receives a weighted score; the highest is selected.
- Comparative approach / Q-sort: projects are compared and ranked.
- Benefit-cost ratio (BCR): PV of benefits ÷ PV of costs; accept if > 1.
2. Financial (economic) methods
These are also benefit measurement methods, based on cash flows.
- Payback period: time to recover the investment. Shorter is better.
- Net Present Value (NPV): sum of discounted benefits minus costs; accept if NPV > 0.
- Return on Investment (ROI): (Benefits − Costs) ÷ Costs.
- Internal Rate of Return (IRR): discount rate at which NPV = 0; accept if IRR > required rate.
- Discounted payback.
3. Mathematical (constrained optimisation) methods
Linear programming, integer programming, dynamic programming and goal programming, used for large portfolios with resource constraints.
4. Non-numeric methods
- Sacred cow (project suggested by a senior official).
- Operating necessity (to keep the business running).
- Competitive necessity.
- Product line extension.
- Comparative benefit (committee judgment).
| Method | Criterion | Decision rule |
|---|---|---|
| Payback | Time | Shorter is better |
| NPV | Rs value | Positive, highest |
| ROI | % | Higher is better |
| IRR | % | Greater than cost of capital |
| Scoring | Points | Highest score |
Selection tips
Use several methods together; include strategic fit and risk, not just finance.
Example: Project A has NPV Rs 5 lakh and payback 2 years; project B has NPV Rs 2 lakh and payback 4 years. A is preferred.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Project selection with high sediment rivers · Power Plant Design, chapter 3
- Interview in selection of personnel · Construction Management, chapter 10 · asked 2×
- Hydropower site selection factors · Power Plant Design, chapter 3
- IRR selection among A, B, C, D · Engineering Economics, chapter 4