Project selection with high sediment rivers

Short answer

Project selection criteria: hydrology, head, topography/geology, sediment load, access/transmission, environmental/social impact, power market, economics, legal. For high sediment, use gated weir with undersluice and debris barrier, side intake on outer bend with raised sill and sediment excluder, gravel trap, large desander, Pelton or sediment-resistant Francis with hard coatings, and shutdown during high sediment peaks.

What are the criteria for selection of a hydropower project? If the water in the river is known to carry high sediments and debris, what would be your particular recommendation in its design?

Criteria for selection of a hydropower project

  1. Hydrology: sufficient and reliable flow; FDC and long-term data.
  2. Head: steep gradient or large drop over a short distance.
  3. Topography and geology: good dam, tunnel and powerhouse sites; stable slopes.
  4. Sediment and hazards: sediment load, floods, GLOF, landslides and seismicity.
  5. Access and transmission: road access and distance to grid or load centre.
  6. Environmental and social impact: submergence, resettlement, fish, protected areas; EIA clearance.
  7. Power market: demand, PPA possibility and energy mix (peaking or base load).
  8. Economics: cost per kW, levelised cost per kWh, IRR, B/C ratio, payback.
  9. Legal and institutional: licences, water rights and local acceptance.

Recommendation for a river with high sediment and debris

  1. Headworks: gated weir with undersluice to keep the intake area flushed; boulder/debris barrier and coarse trash rack upstream of intake.
  2. Intake design: side intake placed on the outer bend, raised sill and sediment excluder to draw cleaner surface water.
  3. Gravel trap close to the intake with flushing gates.
  4. Larger desander: multiple bays, designed to remove finer particles (e.g. 0.2 mm, or 0.1–0.15 mm for high-head Pelton/Francis), with continuous or frequent flushing.
  5. Turbine choice: prefer Pelton where head allows, as it is easier to repair; for Francis, use lower runner velocity and sediment-resistant design.
  6. Materials: 13Cr-4Ni stainless steel runners with hard coatings (e.g. tungsten-carbide HVOF) on runners, guide vanes and nozzles.
  7. Operation: monitor sediment concentration online and shut down units during flood peaks above a set limit; keep spare runners and needles.
  8. For storage/pondage: provide low-level flushing outlets and plan regular reservoir flushing.