- 2078 Kartik · 8 marks
Daily pondage run-of-river components
Short answer
A daily pondage ROR project consists of diversion weir with spillway, intake, gravel trap, desander, daily pondage for storing off-peak flow, headrace tunnel, surge tank, penstock, powerhouse with turbine-generator, tailrace, and switchyard. The pond enables peaking operation by storing water during off-peak hours for use during peak demand.
Discuss major components of a Daily Pondage Run off the River type hydropower project with suitable schematic diagram.
A daily pondage run-of-river (PROR) project stores river water for a few hours each day in a small pond so the plant can generate more during the daily peak load. It has all ROR components plus the pondage.
Schematic
River ==|== Weir/dam + spillway + undersluice
|
Intake ---> Gravel trap ---> Desander
|
[ DAILY PONDAGE ]
|
Headrace tunnel/canal
|
Surge tank/forebay
|
Penstock
|
Valve -> Turbine -> Generator
| |
Tailrace Transformer
| |
River Switchyard
Major components
- Headworks: diversion weir or low dam to raise water level; gated spillway for floods; undersluice to flush sediment away from the intake.
- Intake: side or frontal intake with trash rack and gates to admit design discharge.
- Gravel trap: removes gravel and coarse sand near the intake.
- Desander (settling basin): long, slow-flow basin where fine sediment settles; flushed periodically. Essential in Nepal to protect turbines.
- Daily pondage: small reservoir (or enlarged desander/forebay) that stores the off-peak inflow. Storage needed peak hours. It lets a dry-season plant give full output for about 4–6 peak hours.
- Headrace tunnel or canal: carries water to the surge tank/forebay with small head loss.
- Surge tank (or forebay): absorbs pressure surges and supplies water during sudden load increase.
- Penstock: steel pressure pipe with anchor blocks; valve at the top for emergency closure.
- Powerhouse: turbine (Francis for medium head, Pelton for high head), generator, governor, excitation, cooling and control systems.
- Tailrace: returns water to the river.
- Electrical works: step-up transformer, switchyard and transmission line to the grid.
Advantages
Higher peak capacity and revenue than plain ROR, better match with Nepal's evening peak, and much smaller submergence than a storage project. Examples in Nepal: Kaligandaki "A", Middle Marsyangdi and Upper Tamakoshi are peaking ROR projects.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Daily pondage ROR with 150 m head · Power Plant Design, chapter 3
- High dam hydropower project components · Power Plant Design, chapter 3
- Components of a run-of-river plant · Power Plant Design, chapter 3 · asked 2×
- Schematic of a PROR hydropower plant · Power Plant Design, chapter 3 · asked 2×
- Reservoir type hydropower plant schematic · Power Plant Design, chapter 3
- ROR versus PROR hydropower plants · Power Plant Design, chapter 3
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- Schematic diagram of rural gravity scheme · Water Supply Engineering, chapter 1 · asked 5×
- Pondage surface area and weekly output · Hydropower Engineering, chapter 3
- Appraisal aspects of a hydropower project · Project Engineering, chapter 2 · asked 4×