Pondage surface area and weekly output

Short answer

Pond surface area is about 4.49 km². Weekly switchboard output is about 1.16 GWh, using average head of 24.5 m.

During a low water week a river has an average daily flow of 40 m³/s. Fluctuation during the day required a pondage capacity of approximately 30% of the daily discharge. A hydroelectric plant is to be located on the river which will operate 6 days a week, 24 hours a day, but will supply power at a varying rate such that the daily load factor is 50%, corresponding to which the pondage required is equal to 0.2 times the mean flow to the turbine. On Saturday all the flow is ponded for use on the rest of the days. If the effective head on the turbines when the pond is full is to be 25 m and the maximum allowable fluctuation in pond level is 1 m, find (i) the surface area of the pond to satisfy all the operating conditions, (ii) the weekly output at the switch board in kWh. Assume turbine efficiency 80% and generator efficiency 90%.

Data

Inflow Q=40Q=40 m³/s; daily inflow volume =40×86400=3,456,000=40\times86400 = 3,456,000 m³. The plant works 6 days (Sunday-Friday) and on Saturday the whole flow is stored. Hfull=25H_{full}=25 m, maximum fluctuation =1=1 m, ηt=0.80\eta_t=0.80, ηg=0.90\eta_g=0.90.

(i) Surface area of the pond

1. Weekly pondage (Saturday flow): all of Saturday's inflow is stored for use on the other days.

V1=40×86400=3,456,000 m3V_1 = 40\times86400 = 3,456,000\ \text{m}^3

2. Daily pondage: two requirements are given.

  • To take care of the daily flow fluctuation: 0.30×3,456,000=1,036,8000.30\times3,456,000 = 1,036,800 m³
  • For the 50% daily load factor: mean flow to the turbines on working days =40×76=46.67=40\times\frac{7}{6}=46.67 m³/s, so the pondage =0.2×46.67×86400=806,400=0.2\times46.67\times86400 = 806,400 m³

The pond must satisfy both, so the larger value is taken: V2=1,036,800V_2=1,036,800 m³.

3. Total live storage:

V=V1+V2=3,456,000+1,036,800=4,492,800 m3V = V_1+V_2 = 3,456,000+1,036,800 = 4,492,800\ \text{m}^3

The allowed draw-down is 1 m, so

A=VΔh=4,492,8001=4,492,800 m2≈4.49 km2A = \frac{V}{\Delta h} = \frac{4,492,800}{1} = 4,492,800\ \text{m}^2 \approx 4.49\ \text{km}^2

(ii) Weekly output at the switchboard

The whole weekly inflow is used: 40×7×24=6,72040\times7\times24 = 6,720 m³/s·h. The pond level goes down by 1 m, so the average head is 25−0.5=24.525-0.5 = 24.5 m.

E=9.81 ηtηg H ∑Q t=9.81×0.80×0.90×24.5×6,720=1,162,885 kWhE = 9.81\,\eta_t\eta_g\,H\,\sum Q\,t = 9.81\times0.80\times0.90\times24.5\times6,720 = 1,162,885\ \text{kWh}

(With the full-pond head of 25 m, the figure would be 1,186,618 kWh.)

Answer: pond surface area ≈ 4.49 km² (4,492,800 m²); weekly output ≈ 1.16 GWh (1,162,885 kWh).