- 2076 Ashwin · 5+5 marks
Pondage surface area and weekly output
Short answer
Pond surface area is about 4.49 km². Weekly switchboard output is about 1.16 GWh, using average head of 24.5 m.
During a low water week a river has an average daily flow of 40 m³/s. Fluctuation during the day required a pondage capacity of approximately 30% of the daily discharge. A hydroelectric plant is to be located on the river which will operate 6 days a week, 24 hours a day, but will supply power at a varying rate such that the daily load factor is 50%, corresponding to which the pondage required is equal to 0.2 times the mean flow to the turbine. On Saturday all the flow is ponded for use on the rest of the days. If the effective head on the turbines when the pond is full is to be 25 m and the maximum allowable fluctuation in pond level is 1 m, find (i) the surface area of the pond to satisfy all the operating conditions, (ii) the weekly output at the switch board in kWh. Assume turbine efficiency 80% and generator efficiency 90%.
Data
Inflow m³/s; daily inflow volume m³. The plant works 6 days (Sunday-Friday) and on Saturday the whole flow is stored. m, maximum fluctuation m, , .
(i) Surface area of the pond
1. Weekly pondage (Saturday flow): all of Saturday's inflow is stored for use on the other days.
2. Daily pondage: two requirements are given.
- To take care of the daily flow fluctuation: m³
- For the 50% daily load factor: mean flow to the turbines on working days m³/s, so the pondage m³
The pond must satisfy both, so the larger value is taken: m³.
3. Total live storage:
The allowed draw-down is 1 m, so
(ii) Weekly output at the switchboard
The whole weekly inflow is used: m³/s·h. The pond level goes down by 1 m, so the average head is m.
(With the full-pond head of 25 m, the figure would be 1,186,618 kWh.)
Answer: pond surface area ≈ 4.49 km² (4,492,800 m²); weekly output ≈ 1.16 GWh (1,162,885 kWh).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- RoR installed capacity without pondage and with peaking · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- Minimum reservoir capacity and wasted water · Hydropower Engineering, chapter 3
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- Daily pondage run-of-river components · Power Plant Design, chapter 3
- River flow required for 1500 population · Sanitary Engineering, chapter 6
- Rural area 22000 L/day river supply (question text cut) · Water Supply Engineering, chapter 7
- Daily pondage ROR with 150 m head · Power Plant Design, chapter 3