- 2070 Ashad · 2+4+2 marks
RoR capacity, peaking capacity and benefit
Short answer
(i) 123.4 MW. (ii) 277.7 MW. (iii) Extra benefit ≈ Rs 3.70 million per day (≈ Rs 111 million per month).
The mean monthly flow of a typical Nepalese river is as follows:
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 80 | 74 | 83 | 100 | 130 | 222 | 600 | 800 | 590 | 240 | 120 | 100 |
i) Calculate the installed capacity of a plant based on the minimum flow of the river without pondage (if the plant is designed for a pure run-of-river plant) with net head of 200 m and overall efficiency of the plant 85%. ii) The plant has three sets of units (turbine and generator) such that one unit with full capacity is operated during off-peak hours. If the plant is designed as a peaking plant with 4 hour peaking (morning 2 hour and evening 2 hour), what will be the installed capacity of the plant? iii) What will be the increase in benefit from peaking if the peak hour energy rate is Rs 12/kWh and the off-peak energy rate is Rs 6/kWh during the minimum flow month?
i) Pure run-of-river plant
Minimum flow is 74 m³/s (February).
ii) Peaking plant with three units, 4 h peaking
One unit (discharge ) runs at full load for the 20 off-peak hours; all three units () run for the 4 peak hours. Daily water balance on the minimum flow of 74 m³/s:
Peak discharge m³/s.
(Each unit is 92.56 MW. Check storage: off-peak stored m³/s·h; peak draw m³/s·h, equal.)
iii) Increase in benefit during the minimum flow month
Daily energy is the same in both cases ( MWh).
- RoR (constant output): 4 peak hours at Rs 12 and 20 off-peak hours at Rs 6 per kWh:
- Peaking plant: per day
Increase Rs/day Rs 3.70 million per day, or about Rs 111.1 million for a 30-day month.
Answer: (i) 123.4 MW; (ii) 277.7 MW; (iii) extra benefit ≈ Rs 3.70 million per day (≈ Rs 111 million per month).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- Peaking RoR: max power and wet/dry energy ratio · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3