- 2075 Bhadra · 8 marks
Firm and secondary energy from average monthly flows
Short answer
With assumed head 100 m and efficiency 85%, firm energy is 730.5 GWh/yr from June minimum flow (100 m³/s). Secondary energy is 4428.4 GWh/yr; total 5158.8 GWh/yr.
Determine the firm and secondary energy for the following set of data of average monthly flows of river over a year.
| Months | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 150 | 250 | 300 | 425 | 500 | 100 | 1250 | 1100 | 1000 | 1300 | 1600 | 500 |
Firm energy is produced by the minimum flow (available 100% of the time); secondary energy is the extra energy from flow above the minimum.
Assumptions
The head, efficiency and plant capacity are not given, so assume:
- Net head m, overall efficiency
- The plant can use all the river flow (no spilling)
- Each month = 730 h
Note: the June flow (100 m³/s) is taken as printed, so June is the minimum-flow month.
Power per unit discharge
Firm energy
Minimum flow = 100 m³/s.
Total energy
| Month | Q (m³/s) | Power (MW) |
|---|---|---|
| Jan | 150 | 125.08 |
| Feb | 250 | 208.46 |
| Mar | 300 | 250.16 |
| Apr | 425 | 354.39 |
| May | 500 | 416.93 |
| Jun | 100 | 83.39 |
| Jul | 1250 | 1042.31 |
| Aug | 1100 | 917.24 |
| Sep | 1000 | 833.85 |
| Oct | 1300 | 1084.01 |
| Nov | 1600 | 1334.16 |
| Dec | 500 | 416.93 |
| Sum | 8475 |
In general form: and kWh, so the answer scales directly with the assumed .
Answer (H = 100 m, η = 85%): firm energy ≈ 730.5 GWh/yr; secondary energy ≈ 4428.4 GWh/yr.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Primary and secondary energy with 10% environmental flow · Hydro Power, chapter 3
- Primary and secondary energy (102 m head) · Hydro Power, chapter 3
- Primary/secondary energy and pondage volume · Hydro Power, chapter 3
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3