- Asked 2/18
- 2078 Chaitra · 7 marks
Annual firm and secondary energy (900 m³/s, Nov 100)
Short answer
Annual firm energy 773.4 GWh from minimum flow 100 m³/s. Secondary energy 3016.3 GWh, total 3789.8 GWh. Installed capacity 794.6 MW at design discharge 900 m³/s. Power per unit discharge 882.9 kW per m³/s. Monthly energy summed using flows capped at 900 m³/s over 730 hours per month.
Following are the mean monthly flow of the river. Where head (H) = 100 m, overall efficiency = 90% and design discharge selected is 900 m³/s. Calculate the annual firm and secondary energy.
| Month | Jan | Feb | Mar | Apr | May | Jun | July | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Flow (m³/s) | 100 | 120 | 140 | 300 | 320 | 1800 | 2000 | 2510 | 2000 | 900 | 100 | 300 |
Firm energy is the energy from the minimum flow (available all year). Secondary energy is the extra energy from flows above the minimum, limited by the design discharge of 900 m³/s.
Power per unit discharge
Installed capacity MW.
Firm energy
Minimum flow = 100 m³/s (January and November).
Total energy (730 h per month)
| Month | Q | Q used | Power (MW) |
|---|---|---|---|
| Jan | 100 | 100 | 88.29 |
| Feb | 120 | 120 | 105.95 |
| Mar | 140 | 140 | 123.61 |
| Apr | 300 | 300 | 264.87 |
| May | 320 | 320 | 282.53 |
| Jun | 1800 | 900 | 794.61 |
| Jul | 2000 | 900 | 794.61 |
| Aug | 2510 | 900 | 794.61 |
| Sep | 2000 | 900 | 794.61 |
| Oct | 900 | 900 | 794.61 |
| Nov | 100 | 100 | 88.29 |
| Dec | 300 | 300 | 264.87 |
| Sum | 5880 |
Answer: Annual firm energy ≈ 773.4 GWh; annual secondary energy ≈ 3016.3 GWh (total ≈ 3789.8 GWh).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3
- Primary and secondary energy with 10% environmental flow · Hydro Power, chapter 3
- Primary and secondary energy (102 m head) · Hydro Power, chapter 3
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Primary/secondary energy and pondage volume · Hydro Power, chapter 3
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- RoR at 40% exceedence; storage regulation · Hydropower Engineering, chapter 3